Skip to main content

Strong interest in building new Chile-Argentina tunnel link

Interest is strong in the proposed tunnel linking Chile and Argentina. Some 37 companies have shown expressions of interest in the US$1 billion Agua Negra road tunnel. This includes 22 consortia and includes Latin American firms such as Panedile, Techint, Camargo Correa, Jose Cartellone. It also includes the Chinese firms China Railway Construction Corporation, China Railway Bureau Group, China State Construction Engineering Corporation and Sinohydro Group. Daewoo, Hyundai Engineering and SK Eng & Construct
October 30, 2013 Read time: 2 mins
Interest is strong in the proposed tunnel linking Chile and Argentina. Some 37 companies have shown expressions of interest in the US$1 billion Agua Negra road tunnel. This includes 22 consortia and includes Latin American firms such as 2429 Panedile, Techint, Camargo Correa, 1390 Jose Cartellone. It also includes the Chinese firms 6590 China Railway Construction Corporation, 890 China Railway Bureau Group, 5711 China State Construction Engineering Corporation and 5544 Sinohydro Group. 3086 Daewoo, 5739 Hyundai Engineering and SK Eng & Construction from South Korea are also interested in the project. A bi-lateral body, Ebitan, is administering the applications, which have come from firms in Brazil, China, Italy and Korea, as well as local companies in Argentina and Chile according to Business News Americas. A list of prequalified companies is being released while the tender process is set to open in early 2014. The link will feature twin tunnels nearly 14km long connecting Argentina's San Juan province with Chile's Coquimbo region (region IV). The tunnel is of enormous economic importance to both Argentina and Chile and will help transport and trade between the two countries. The new tunnel will be able to carry traffic that presently has to use either another tunnel, or a dangerous mountain pass that is often closed in poor weather and is not suitable for heavy vehicles. As well as the twin tube tunnel itself, the project also includes upgrades to some 50km of roads in Region IV that will lead to the portal. Work will also be required to improve an airport in Region IV and improve routes 41, 43 and 45 in the region. Construction of the Agua Negra tunnel will be challenging however as both portals are at altitude, which poses severe limitations on the performance of both personnel and equipment. Winter weather conditions can be tough and access to the portal areas can be tricky in poor weather, which will further add to the challenges the construction team will face.

Related Content

  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Safety issues fuel interest at PIARC’s tunnel conference in Lyon
    June 4, 2019
    Alternative fuel and automated vehicle issues occupied minds at PIARC’s first international road tunnel safety conference. David Arminas reports from Lyon More than ever, tunnel management must done in a wholistic fashion, said Andre Broto, president of PIARC, the World Road Association, based in Paris. With those sentiments, Broto kicked off PIARC’s first International Conference on Tunnel Operations and Safety. One of the first speakers, Sandrine Bernabei Chinzi, head of transport infrastructure at Fr
  • Work to start on Mianyang-Jiuzhaigou Expressway, China
    March 24, 2014
    Work on the new 218.5-kilometre Mianyang-Jiuzhaigou Expressway in Sichuan province, China is expected to begin later this year. Upon completion of the US$4.91 billion (CNY 30.58 billion) megaproject, the travel time from Chengdu city in the province to Jiuzhaigou via the expressway will take only 210 minutes. The expressway is expected to be completed within 60 months and is scheduled to be operational no later than 31 December 2018. Meanwhile, construction of the Ziyuan-Xing'an highway has fully started.
  • New excavators and wheeled loaders for earthmoving market
    October 28, 2016
    Manufacturers are continuing to develop new excavators and wheeled loaders offering increased performance - Mike Woof writes. New developments are being seen in both the wheeled loader and excavator markets. Caterpillar, Daewoo, Hitachi, Hyundai, Komatsu, Kobelco and Volvo CE all have new wheeled loader or excavator models now available. The segment for wheeled loaders has seen particular innovation from Caterpillar, with different machines being introduced for tightly regulated and lesser regulated mark