Skip to main content

Strabag’s Züblin subsidiary wins key A 100 Berlin urban motorway contract

Strabag subsidiary Züblin has been awarded the €73 million contract to build a 700 metre section of the A 100 urban motorway in Berlin, Germany. Situated at Sonnenallee Junction, the works will see Züblin not only construct a new dual-track commuter rail bridge and a single-track long-distance railway bridge, each with 68m spans; but also set up diaphragm walls, establish underwater concrete floors, install uplift and pit lining anchors, and drive the sheet piling and bored piles. The contract also encomp
May 28, 2014 Read time: 1 min
945 Strabag subsidiary Züblin has been awarded the €73 million contract to build a 700 metre section of the A 100 urban motorway in Berlin, Germany.

Situated at Sonnenallee Junction, the works will see Züblin not only construct a new dual-track commuter rail bridge and a single-track long-distance railway bridge, each with 68m spans; but also set up diaphragm walls, establish underwater concrete floors, install uplift and pit lining anchors, and drive the sheet piling and bored piles. The contract also encompasses the delivery and installation of 200,000m³ of concrete.

The works, which have already begun and are expected to last until August 2017, will be carried out with no interruption to rail service, necessitating the construction of several auxiliary bridges.

“This challenging construction order requires the extensive know-how of our ground engineering team,” said Thomas Birtel, CEO of Strabag.

For more information on companies in this article

Related Content

  • Soilmec’s compact piling rig works in tight spots
    February 2, 2015
    Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger
  • Soilmec’s compact piling rig works in tight spots
    January 6, 2017
    Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Strabag raises 2011-2012 outlook
    May 9, 2012
    After a solid first quarter 2011, Strabag, Central and Eastern Europe’s largest construction company, has raised its outlook for the financial years 2011 and 2012. According to the new forecast, Strabag expects an output volume of €14 billion in 2011 (previous target €13.5 billion), with earnings before interest and taxes (EBIT) forecast to increase to €320 million, after €295 million had been predicted. For 2012, the company had expected an output volume of €13.7 billion and an EBIT of €300 million, whi