Skip to main content

Strabag’s Züblin subsidiary wins key A 100 Berlin urban motorway contract

Strabag subsidiary Züblin has been awarded the €73 million contract to build a 700 metre section of the A 100 urban motorway in Berlin, Germany. Situated at Sonnenallee Junction, the works will see Züblin not only construct a new dual-track commuter rail bridge and a single-track long-distance railway bridge, each with 68m spans; but also set up diaphragm walls, establish underwater concrete floors, install uplift and pit lining anchors, and drive the sheet piling and bored piles. The contract also encomp
May 28, 2014 Read time: 1 min
945 Strabag subsidiary Züblin has been awarded the €73 million contract to build a 700 metre section of the A 100 urban motorway in Berlin, Germany.

Situated at Sonnenallee Junction, the works will see Züblin not only construct a new dual-track commuter rail bridge and a single-track long-distance railway bridge, each with 68m spans; but also set up diaphragm walls, establish underwater concrete floors, install uplift and pit lining anchors, and drive the sheet piling and bored piles. The contract also encompasses the delivery and installation of 200,000m³ of concrete.

The works, which have already begun and are expected to last until August 2017, will be carried out with no interruption to rail service, necessitating the construction of several auxiliary bridges.

“This challenging construction order requires the extensive know-how of our ground engineering team,” said Thomas Birtel, CEO of Strabag.

For more information on companies in this article

Related Content

  • Expanding the Panamericana Oestae Highway in Panama
    November 3, 2023
    Expansion of the Panamericana Oeste highway is an infrastructure project that will help guarantee the future of Panama - Mauro Nogarin writes
  • Innovations in piling technology
    December 15, 2017
    The market for piling machines is seeing new technology come to market – Mike Woof writes UK firm BSP is now offering an improved range of piling systems, with its SL30 model and compact BH120. The SL30 can be used to drive Z piles in pairs and its hammer has a drop weight of 2.5tonnes, delivering an impact energy of 30kNm at up 84blows/minute. The SL piling hammer is designed for driving sheet piles and small bearing piles and is available with legs and inserts for use when freely suspended or with back
  • Amey awarded southwest strategic highways contract in Scotland
    April 6, 2020
    Amey starts in August on the €454 million contract for at least eight years.
  • STRABAG’s German highway assets increased
    October 4, 2018
    STRABAG has increased its stake in the A8 motorway operator PANSUEVIA. This share has been boosted from 50% to 100%. PANSUEVIA operates the autobahn stretch that runs between Ulm and Augsburg in the south of the country. SRABAG purchased the 50% stake in PANSUEVIA that was previously held by HOCHTIEF. As a result, STRABAG is now the 100% owner of the concession company operating the Ulm–Augsburg section of the A8 autobahn. Both parties agreed not to disclose the purchase price however. This section of the