Skip to main content

STRABAG wins Norway road and tunnel contract

STRABAG will build a section of the European Route E16 in Norway. This route connects capital Oslo with the Norway’s second largest city, Bergen and will be the first construction project being carried out in the country with STRABAG as sole contractor. The Øye–Eidsbru section is located about midway between Oslo and Bergen. The work comprises the new construction of 4.5km of main road and 2.1km of side roads. It includes a 1.97km long tunnel that will be built using conventional drilling and blasting me
May 12, 2016 Read time: 2 mins
945 STRABAG will build a section of the European Route E16 in Norway. This route connects capital Oslo with the Norway’s second largest city, Bergen and will be the first construction project being carried out in the country with STRABAG as sole contractor.

The Øye–Eidsbru section is located about midway between Oslo and Bergen. The work comprises the new construction of 4.5km of main road and 2.1km of side roads. It includes a 1.97km long tunnel that will be built using conventional drilling and blasting methods. This section of the E16 lies in a mountainous area known as Filefjell, which has a peak elevation of 1,920m. The road will pass its highest point at 1,013m above sea level. Temperatures in the area can reach -25°C in the winter and massive snowfall is a common occurrence. The climate and location will present challenges to STRABAG although the firm says it is confident that it can carry out the work successfully.

For more information on companies in this article

Related Content

  • Breakthrough for Slovenian Karavanke Tunnel
    April 2, 2024
    The existing tunnel Karavanke Tunnel tube between Austria and Slovenia opened in 1991.
  • Oslofjord Tunnel closed for repairs for up to three weeks
    May 12, 2017
    The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will
  • Tunnelling conference and competition
    September 23, 2019
    The annual tunnelling conference and competition is due to take place in Miami from the 18th-20th November in Miami, Florida. The competition features eight categories and aims to identify the most important ongoing underground works and technologies that help cities change and enable habits and ways of life to evolve in order to build smart and sustainable urba
  • Colombian highway projects under development
    June 29, 2018
    A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km