Skip to main content

STRABAG wins contract for Hamburg, Germany

STRABAG has won a major highway contract in Hamburg, Germany.
By MJ Woof August 26, 2020 Read time: 3 mins
Hamburg is to benefit from a major highway upgrade being carried out by STRABAG

STRABAG has won a major contract in Germany to widen the country’s longest highway viaduct to eight lanes. The project is to widen and rehabilitate the Hochstraße Elbmarsch A7 motorway viaduct (K20) in Hamburg.

The work will be carried out by a consortium comprising STRABAG Subdivision Bridge Construction and Subdivision North. The contract was awarded by the German motorway planning and construction company DEGES and the deal is worth over €200 million.

Work on the 3.84km long section is to be completed by 2027.

The elevated Hochstraße Elbmarsch section of the A7 begins a few hundred metres after the exit from the Elbe Tunnel heading south, passes over Rugenberg Port, crosses two railway lines and eleven roads and paths in the Hamburg city limits, and ends at the Hamburg-Hausbruch motorway exit.

STRABAG is currently carrying out the detailed design; at the same time, work has already begun on site installation, demolition and removal, and deep foundation. The aim of the work is to improved traffic flow on central north-south link.

“We are delighted to have been awarded this major German infrastructure project and are gratified by the confidence placed in the capabilities of our infrastructure construction teams. The widening of this busy section of the A7 motorway will improve the traffic flow on Germany’s central north-south link in the long term,” said Thomas Birtel, CEO of STRABAG SE. The daily volume of traffic on this section of the A7 motorway has increased to between 50,000 and 60,000 vehicles in each direction since the construction of the elevated road 45 years ago. STRABAG Subdivision Bridge

The option to widen the viaduct had already been planned for and prepared when the elevated road was built in 1975. The foundations in the port area and the connecting reinforcements on the inner sides of the bridge superstructures, structurally separated for both directions of travel, can now be used for the planned upgrade. The fourth lane will be added to the inner side of each viaduct, bringing the two sections of the A7 closer together. Traffic is to be disrupted as little as possible during the construction work. The widening will be carried out in steps to allow traffic to continue to flow along three lanes in both directions at all times.

The upgrade will begin on the carriageway in the direction of Flensburg (north), with work scheduled for completion by mid-2024. This will be followed by the start of the second phase, the widening to four lanes of the carriageway in the direction of Hanover (south). Three further STRABAG Group entities are also involved in this project: STRABAG Business Unit Hamburg (road construction), Züblin Stahlbau GmbH (steel girders) and Zentrale Technik Hamburg (planning).

The widening of the Hochstraße Elbmarsch elevated road will involve the use of around 19,200m³ of concrete. In addition, 15km of steel railing will have to be renewed. The rehabilitation of the roadway will require the removal of asphalt and waterproofing over an area of 135,000m² and the laying of new asphalt over an area of 155,000m².

For more information on companies in this article

Related Content

  • Duisburg double for lift specialist Sarens
    June 5, 2024
    Heavy lift specialist Sarens overcame challenging wind and water conditions during installation of two strategic road bridges - the Oberbürgermeister Karl Lehr Brücke and the Hafenkanalbrücke - in the German city of Duisburg.
  • New bridge to replace old
    July 24, 2012
    Neckarauer overpass, a railroad bridge adjacent to the plant of German paving equipment manufacturer Vögele, is one of Mannheim's main traffic arteries. Built in 1936, the overpass represents an important link into the city for commuters coming from the south of the Rhine-Neckar region being used by some 60,000 vehicles/day, together with several tram lines running every five minutes. Corrosion has caused heavy damage to the steel girder bridge, and recently a 30km/hour speed limit has been in place along w
  • Kenya moves ahead with double-decker road to address costly city traffic jams
    December 11, 2013
    New double deck roads could cut congestion in Kenyan capital Nairobi – Shem Oirere reports Arapid increase in urban population and diminishing land for infrastructure expansion has forced Kenya to devise ways of addressing the worsening human and vehicular traffic problems in its capital Nairobi. The country national highways agency recently announced progress in the planned construction of the country’s first double-decker highway.
  • REBLOC barriers for Rheinbrücke Leverkusen
    July 26, 2024
    Construction of the vehicle restraint system for the new Rheinbrücke A1 Leverkusen (bridge) in Germany was a challenge, according to REBLOC, maker of the system.