Skip to main content

Strabag secures US$2.23billion Italian motorway build project

The US$2.23billion (€1.7billion) contract to build the Pedemontana Lombarda motorway in northern Italy has been won by the Strabag consortium.
March 14, 2012 Read time: 2 mins
RSSThe US$2.23billion (€1.7billion) contract to build the Pedemontana Lombarda motorway in northern Italy has been won by the 945 Strabag consortium.

The new motorway in the heart of Lombardy’s economic zone will connect the city of Bergamo in northern Italy with Milan’s Malpensa Airport, strengthening northern Italy’s East-West link, relieving the local roads in the north of Milan and providing a boost to the local industry. Set to begin this summer and conclude in time for the 2015 Milan Universal Exposition, the order includes the construction of a 52km dual carriageway motorway with two or three lanes in each direction as well as 50km of spurs and connecting routes to the existing road network. It also comprises 50 cut-and-cover tunnels, two bored tunnels including the technical facilities, three bridges covering a total length of 3km, and a near 80km bicycle trail. Strabag, a leading central and eastern European construction company with its headquarters in Vienna, Austria, hold 60 % of the consortium, with the remaining amount divided between Italian companies 3869 Grandi Lavori Fincosit (26%) and 3873 Impresa Costruzioni Giuseppe Maltauro (14%).

Meanwhile, new figures released by Strabag showed its output volume rose by 12% to $18.79billion (€14.3billion)in the 2011 financial year, compared to $16.82billion (€12.8billion) in 2010. The company said the growth was due to strong demand in the German building construction and civil engineering sectors, and the “booming” Polish construction sector fuelled by investment in transport infrastructure.

For more information on companies in this article

Related Content

  • A bullish Strabag adjusts upwards its 2019 outlook
    November 30, 2018
    Strabag - in a bullish mood - has adjusted upwards its 2019 outlook as it publishes its nine-month figures for 2018. We now expect the output volume to clearly exceed €15 billion and the operating EBIT margin to attain at least last year’s level of 3.3%. These forecasts lead us to anticipate another record year,” said Thomas Birtel, chief executive Strabag. Output volume was just over €11.6 billion in the first nine months of the 2018 financial year. The company statement said that this upwards moveme
  • Italy's new southern highway route
    May 13, 2021
    An important new highway route is currently under construction in South Italy
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Strabag wins Polish A1 motorway deal for Wozniki-to-Pyrzowice section
    September 2, 2015
    Strabag consortium has signed a contract for construction of a 15.2km section of the A1 motorway between Wozniki and Pyrzowice. Completion of the section that will connect Pyrzowice with Czestochowa is due by the end of 2018. It is the first of four contracts signed for construction of the motorway. Strabag’s offer is believed to be around €144 million, while the budget set by the General Directorate for National Roads and Motorways (GDDKiA), was set just over €200 million. Meanwhile, the S6 dual car