Skip to main content

STRABAG building two more Polish routes

Contractor STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as
January 12, 2018 Read time: 1 min

Contractor 945 STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as lighting and drainage systems.

For more information on companies in this article

Related Content

  • Contractor Strabag reports strong performance
    April 30, 2013
    Austrian contractor STRABAG reports healthy earnings before interest and taxes (EBIT) of €207 million in 2012. This figure beats the firm’s own expectations and the expectations of the market. Net income after minorities stood at €61 million, showing an expected considerable decrease of 66.67% compared to the year before. “An output volume of €14 billion in 2012 – that’s nothing to complain about. With €13.2 billion, the end-of-the-year order backlog is also nearly exactly at the pre-crisis level of 2008, s
  • Mostostal Warszawa picked for S19 segment
    August 11, 2022
    The contract in northern Poland is worth around €211 million.
  • Lane Construction to carry out Florida highway deal
    November 24, 2017
    Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco
  • Colombia’s popular highway tenders
    April 7, 2014
    International interest is strong in tenders opening in Colombia for the construction and management of 1,146km worth of highways. These form part of a package for 10 projects known as Autopistas para la Prosperidad, worth some US$4.75 billion in all. OHL has expressed an interest in the Autopista al Mar 2 and Autopista al Rio Magdalena 1 highway projects, which have been valued at around $1.9 billion.