Skip to main content

Stonehenge tunnel project being designed

Consultant AECOM is now working with Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. T
April 12, 2017 Read time: 2 mins
Consultant 1397 AECOM is now working with 8100 Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. The A303 features a single lane in either direction at this stretch, which is not able to cope with traffic demand. Delays are frequent along this stretch of the route at peak periods, particularly during the holiday season when the normal traffic volumes, which includes a high percentage of heavy trucks, are further augmented by the presence of tourist vehicles. Safety is also a key concern. As a result, the plans call for the construction of a dual carriageway route running through a tunnel, which will boost capacity and safety, while minimising the impact of the busy road on the important archaeology of the area. The route also currently passes through Winterbourne Stoke and the project includes a bypass for the village, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360. As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

For more information on companies in this article

Related Content

  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • Geosynthetics stabilise differential settlement
    May 3, 2012
    The ongoing Highways Agency A66 Carkin Moor to Scotch Corner project involves upgrading the original single carriageway to address safety concerns, particularly at junctions and crossings. Where differential settlement is threatening a remodelled junction, Tensar International's new TriAx geogrid provides an additional dimension of stability, saving design and build contractors Balfour Beatty Regional Civil Engineering Limited (BBRCEL) the heavy time and costs inherent in conventional remedial solutions and
  • Geosynthetics stabilise differential settlement
    March 14, 2012
    The ongoing Highways Agency A66 Carkin Moor to Scotch Corner project involves upgrading the original single carriageway to address safety concerns, particularly at junctions and crossings. Where differential settlement is threatening a remodelled junction, Tensar International's new TriAx geogrid provides an additional dimension of stability, saving design and build contractors Balfour Beatty Regional Civil Engineering Limited (BBRCEL) the heavy time and costs inherent in conventional remedial solutions and
  • New chapter for bituminous slurry in Colombia
    January 11, 2019
    Colombia’s San Rafael road concessionaire is using its first VSB Macropaver 12B unit to maintain a road carrying heavy traffic volumes – Enrique Saez writes The use of bituminous slurry for road maintenance works in Colombia is taking a new step forward with the purchase of equipment from VSS Macropaver by road contractors in the country. Engineer Ezequiel Romero, manager of the concessionaire San Rafael, explained that the application of bituminous grout has delivered major benefits for the firm. The c