Skip to main content

Stonehenge tunnel project being designed

Consultant AECOM is now working with Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. T
April 12, 2017 Read time: 2 mins
Consultant 1397 AECOM is now working with 8100 Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. The A303 features a single lane in either direction at this stretch, which is not able to cope with traffic demand. Delays are frequent along this stretch of the route at peak periods, particularly during the holiday season when the normal traffic volumes, which includes a high percentage of heavy trucks, are further augmented by the presence of tourist vehicles. Safety is also a key concern. As a result, the plans call for the construction of a dual carriageway route running through a tunnel, which will boost capacity and safety, while minimising the impact of the busy road on the important archaeology of the area. The route also currently passes through Winterbourne Stoke and the project includes a bypass for the village, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360. As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

For more information on companies in this article

Related Content

  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Building Spain's highest viaduct
    July 9, 2012
    Amid a mountain wilderness, a new highway system rises, featuring Spain's highest viaduct For years, motorists and truck drivers in northern Spain have had to endure using a dangerous road liable to traffic hold-ups, delays and accidents, and frequently impassable in the depths of winter. In any event it is a slow and tortuous climb from Molledo on the Cantabrian lowlands up the N-611 road through the Cantabrian Mountains to Palencia, on the Meseta, Spain's high central plateau.
  • VolkerFitzpatrick to upgrade M3 junction
    December 20, 2022
    VolkerFitzpatrick will also construct three bridges, rearrange the main junction 9 roundabout and reuse the existing sub-base from the project near London.
  • Bavarian road tunnel opens to traffic
    June 1, 2022
    A new Bavarian road tunnel is now open to traffic