Skip to main content

Stonehenge tunnel controversy exacerbated by recent incident

The controversy surrounding the driving of a new road tunnel close to the UK’s Stonehenge monument has deepened following a recent incident. A 3m diameter hole was allegedly drilled through an important archeological find, a platform constructed of flint and animal bone, located close to the site Stonehenge. The platform is thought to have been erected some 6,000 years ago, making it older than Stonehenge itself, and preserves hoof prints made by aurochs, giant wild cattle that are now long extinct.
December 7, 2018 Read time: 2 mins

The controversy surrounding the driving of a new road tunnel close to the UK’s Stonehenge monument has deepened following a recent incident. A 3m diameter hole was allegedly drilled through an important archeological find, a platform constructed of flint and animal bone, located close to the site Stonehenge. The platform is thought to have been erected some 6,000 years ago, making it older than Stonehenge itself, and preserves hoof prints made by aurochs, giant wild cattle that are now long extinct.

The construction of the tunnel is a necessary project as the busy A303 route features just a single lane in either direction as it passes Stonehenge and the road is no longer fit for purpose. Traffic congestion are delays are frequent along this particular stretch of the A303 while there are serious concerns over safety. One of the biggest controversies surrounding the project however is that many believe the preferred route for the tunnel to be too short, risking damage to the historical site. There are also concerns that driving the new tunnel will affect the high water table in the area, potentially damaging other features of archeological importance.

Stonehenge is a 1384 Unesco world heritage site due to its historic importance.

For more information on companies in this article

Related Content

  • Young motorcycle riders at most risk in Europe
    January 20, 2017
    Young powered two wheelers are most at risk of crashing. That is the key finding of a recent report into powered two wheeler crashes in Europe. The analysis of 9,186 crashes where a motorcyclist was severely injured, shows that specifically young, male riders face a significant risk to become a road traffic victim. The European Commission recently published the ‘Study on serious road traffic injuries in the EU’ to collate data that could in the future prevent serious road traffic injuries. The aim was to
  • Effective, efficient long reach excavators
    April 13, 2012
    Long reach excavators now dominate the demolition sector - Mike Woof reports The last 10-15 years have seen the way demolition work is carried out change dramatically. Safety issues have long been of concern in the demolition sector, with the industry having been criticised for not doing enough to protect its workforce. Demolition projects can be dangerous due to the very nature of the job, with old structures being knocked down and broken up on-site. There is a substantial risk to site workers from
  • Effective, efficient long reach excavators
    February 15, 2012
    Long reach excavators now dominate the demolition sector - Mike Woof reports
  • Innovation in spoil compactors
    February 14, 2012
    The unveiling of HAMM's innovative H20i soil compactor at the recent CONEXPOCON/ AGG exhibition in Las Vegas has been a significant development for this type of equipment. The machine is of note as it packs its emission compliant Deutz diesel under a closefitting cover in the rear chassis. In the 1990s, Ammann was a pioneer in the soil compactor segment when it developed machines featuring a sloping rear engine cover, as well as a larger cab with big glass panes. The range was designed this way so as to