Skip to main content

Stonehenge tunnel controversy exacerbated by recent incident

The controversy surrounding the driving of a new road tunnel close to the UK’s Stonehenge monument has deepened following a recent incident. A 3m diameter hole was allegedly drilled through an important archeological find, a platform constructed of flint and animal bone, located close to the site Stonehenge. The platform is thought to have been erected some 6,000 years ago, making it older than Stonehenge itself, and preserves hoof prints made by aurochs, giant wild cattle that are now long extinct.
December 7, 2018 Read time: 2 mins

The controversy surrounding the driving of a new road tunnel close to the UK’s Stonehenge monument has deepened following a recent incident. A 3m diameter hole was allegedly drilled through an important archeological find, a platform constructed of flint and animal bone, located close to the site Stonehenge. The platform is thought to have been erected some 6,000 years ago, making it older than Stonehenge itself, and preserves hoof prints made by aurochs, giant wild cattle that are now long extinct.

The construction of the tunnel is a necessary project as the busy A303 route features just a single lane in either direction as it passes Stonehenge and the road is no longer fit for purpose. Traffic congestion are delays are frequent along this particular stretch of the A303 while there are serious concerns over safety. One of the biggest controversies surrounding the project however is that many believe the preferred route for the tunnel to be too short, risking damage to the historical site. There are also concerns that driving the new tunnel will affect the high water table in the area, potentially damaging other features of archeological importance.

Stonehenge is a 1384 Unesco world heritage site due to its historic importance.

For more information on companies in this article

Related Content

  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • Holiday traffic jams
    October 3, 2018
    In the Northern Hemisphere the summer means time for families to head off on holiday. At this time of year, many busy routes become jammed as holidaymakers head north, south, east or west, all in search of some rest and recreation. In the UK for example, the start of the school holiday period typically leads to families taking to the roads, with massive spikes in traffic volumes as a result. Some areas are particularly bad. The highway routes lying roughly between Munich in southern Germany and Milan in no
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th
  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.