Skip to main content

Stonehenge tunnel controversy exacerbated by recent incident

The controversy surrounding the driving of a new road tunnel close to the UK’s Stonehenge monument has deepened following a recent incident. A 3m diameter hole was allegedly drilled through an important archeological find, a platform constructed of flint and animal bone, located close to the site Stonehenge. The platform is thought to have been erected some 6,000 years ago, making it older than Stonehenge itself, and preserves hoof prints made by aurochs, giant wild cattle that are now long extinct.
December 7, 2018 Read time: 2 mins

The controversy surrounding the driving of a new road tunnel close to the UK’s Stonehenge monument has deepened following a recent incident. A 3m diameter hole was allegedly drilled through an important archeological find, a platform constructed of flint and animal bone, located close to the site Stonehenge. The platform is thought to have been erected some 6,000 years ago, making it older than Stonehenge itself, and preserves hoof prints made by aurochs, giant wild cattle that are now long extinct.

The construction of the tunnel is a necessary project as the busy A303 route features just a single lane in either direction as it passes Stonehenge and the road is no longer fit for purpose. Traffic congestion are delays are frequent along this particular stretch of the A303 while there are serious concerns over safety. One of the biggest controversies surrounding the project however is that many believe the preferred route for the tunnel to be too short, risking damage to the historical site. There are also concerns that driving the new tunnel will affect the high water table in the area, potentially damaging other features of archeological importance.

Stonehenge is a 1384 Unesco world heritage site due to its historic importance.

For more information on companies in this article

Related Content

  • Scottish road contract moves ahead
    August 30, 2021
    Progress is being seen for a key Scottish road contract.
  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep
  • Driving ahead with tunnelling developments
    June 13, 2012
    New technologies are coming to market with regard to driving and supporting tunnels, with drilling and blasting and accompanying shotcreating technologies being widely used worldwide. Drilling and blasting can be a cost-effective method in the right conditions and in this segment Atlas Copco and Sandvik hold major market shares worldwide, although other firms such as Furukawa and Montabert also compete. Shotcreting equipment is widely used following after drilling and blasting, with CIFA broadening its rang
  • Reunion road project; agreement reached
    August 13, 2020
    An agreement has been reached for the massive Reunion coastal road project.