Skip to main content

Sterling wins accelerated bridge deal in Utah

Ralph L. Wadsworth Construction has won a US$122.7 million design-build project in the US.
By David Arminas April 15, 2021 Read time: 2 mins

Sterling Construction’s subsidiary Ralph L. Wadsworth Construction has been selected by Utah Department of Transportation to renew sections of the interstate I-80 and I-215 highways.

Work on the sections, which run through Salt Lake Valley, will start in May  and will take about two years to complete.

This project consists of the removal and replacement of existing concrete pavement, the design and replacement of four bridge structures and widening and adding lanes to several highway sections.

Two of the bridges will be constructed using accelerated bridge construction, sometimes called the ABC method. It involves the use of advanced technologies to assemble a bridge offsite and then transport it to site for installation, said Joe Cutillo, chief executive of Sterling.

“This sizeable project gives us the opportunity to showcase our highly differentiated accelerated bridge construction capabilities,” said Cutillo. “ABC…dramatically shortens the amount of time it takes to replace a bridge, which translates into substantially reduced traffic impacts and inconvenience to motorists in the area around a job site. Additionally, ABC substantially improves work-zone safety for both drivers and contractor personnel and minimises environmental impact, relative to conventional bridge construction methods.”

According to the website of Ralph L. Wadsworth Construction, the company is “a pioneer” in accelerated bridge construction and reduced construction schedules and traffic disruptions through lateral slides, bridge launches and self-propelled modular transporters (SPMTs), which can allow bridge replacements to be completed in a single 24-hour closure.

Among the company’s projects is the longest two-span bridge ever moved by SPMTs in the western hemisphere - the Sam White Bridge on Utah’s I-15 corridor expansion project. The 354-foot (105m), two-span steel girder Sam White Bridge over the Interstate I-15 in the city American Fork was designed by Michael Baker International engineering consultancy. The bridge was built in a staging area about 500 feet (152m) from the original structure and then moved into place in about five hours during the night using self-propelled modular transporters.

Sterling Construction’s various subsidiaries specialise in heavy civil, specialty services and residential projects in the primarily across southern US states, the Rocky Mountain region, California and Hawaii.

For more information on companies in this article

Related Content

  • Poetry in motion
    August 9, 2018
    A heavy-lift operation by Roll-iT using Enerpac equipment delivered a bridge deck - with a poem engraved on the underside - to Antwerp’s old harbour Only when the deck of the new Londenbrug Bridge is raised do travellers see the poem by Antwerp poet Stijn Vranken. It is written large on the underside of the 300tonne prefabricated steel deck. People waiting for a ship to pass the raised bridge now contemplate the poem’s message about ships transporting goods and people to and from the four corners of the
  • 2010 GRAA Winner Profiles
    April 12, 2012
    Our series of profiles on winning projects from the 2010 Global Road Achievement (GRAA) Awards continues with the Construction Methodology Category won by Barrier Systems/Utah Department of Transportation With any major road construction project, the disruption of traffic flow is of paramount concern for engineers, workers and travellers, particularly as it relates to increased traffic delays and the safety of those driving through the work zone. In the state of Utah, USA, work was recently completed on
  • Concrete paving a smoother surface using machine control technology
    May 17, 2017
    Innovative technology has been used to deliver a smooth concrete road surface on a busy stretch of highway in Nebraska. Much-needed work on a busy section of Interstate 80 has been carried out in Nebraska to improve the road surface. This is one of the most important highways in the US, providing a link that stretches right across the country between the east and west coasts. This busy highway carries a high percentage of heavy truck traffic as it is a vital transport route. However this constant flow of la
  • IRF Global Road Achievement Award Laureate
    January 5, 2016
    As a key engineering project on the Changsha-Chongqing Expressway in Southwest China, the Aizhai Bridge, constructed by the Hunan Road & Bridge Construction Group, was opened to traffic in March 2012. The Aizhai Bridge crosses the 1000m-wide scenic Dehang Canyon at an elevation of 355m. It has a main span of 1,176m, making it the world’s longest canyon-crossing bridge in the world. The erection of the main girder (the stiffening girder) of the Aizhai Bridge encountered serious challenges, including a la