Skip to main content

Sterling wins accelerated bridge deal in Utah

Ralph L. Wadsworth Construction has won a US$122.7 million design-build project in the US.
By David Arminas April 15, 2021 Read time: 2 mins

Sterling Construction’s subsidiary Ralph L. Wadsworth Construction has been selected by Utah Department of Transportation to renew sections of the interstate I-80 and I-215 highways.

Work on the sections, which run through Salt Lake Valley, will start in May  and will take about two years to complete.

This project consists of the removal and replacement of existing concrete pavement, the design and replacement of four bridge structures and widening and adding lanes to several highway sections.

Two of the bridges will be constructed using accelerated bridge construction, sometimes called the ABC method. It involves the use of advanced technologies to assemble a bridge offsite and then transport it to site for installation, said Joe Cutillo, chief executive of Sterling.

“This sizeable project gives us the opportunity to showcase our highly differentiated accelerated bridge construction capabilities,” said Cutillo. “ABC…dramatically shortens the amount of time it takes to replace a bridge, which translates into substantially reduced traffic impacts and inconvenience to motorists in the area around a job site. Additionally, ABC substantially improves work-zone safety for both drivers and contractor personnel and minimises environmental impact, relative to conventional bridge construction methods.”

According to the website of Ralph L. Wadsworth Construction, the company is “a pioneer” in accelerated bridge construction and reduced construction schedules and traffic disruptions through lateral slides, bridge launches and self-propelled modular transporters (SPMTs), which can allow bridge replacements to be completed in a single 24-hour closure.

Among the company’s projects is the longest two-span bridge ever moved by SPMTs in the western hemisphere - the Sam White Bridge on Utah’s I-15 corridor expansion project. The 354-foot (105m), two-span steel girder Sam White Bridge over the Interstate I-15 in the city American Fork was designed by Michael Baker International engineering consultancy. The bridge was built in a staging area about 500 feet (152m) from the original structure and then moved into place in about five hours during the night using self-propelled modular transporters.

Sterling Construction’s various subsidiaries specialise in heavy civil, specialty services and residential projects in the primarily across southern US states, the Rocky Mountain region, California and Hawaii.

For more information on companies in this article

Related Content

  • $270 million Tanzania bridge opens
    July 2, 2025
    A $270 million bridge has opened in Tanzania.
  • Colombia: more money for Toyo Tunnel Project
    April 4, 2024
    The Toyo Tunnel Project – the Guillermo Gaviria Echeverri Tunnel Project - covers 18.3km including new roads and is under construction by Consorcio Antioquia al Mar.
  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.