Skip to main content

Sterling wins accelerated bridge deal in Utah

Ralph L. Wadsworth Construction has won a US$122.7 million design-build project in the US.
By David Arminas April 15, 2021 Read time: 2 mins

Sterling Construction’s subsidiary Ralph L. Wadsworth Construction has been selected by Utah Department of Transportation to renew sections of the interstate I-80 and I-215 highways.

Work on the sections, which run through Salt Lake Valley, will start in May  and will take about two years to complete.

This project consists of the removal and replacement of existing concrete pavement, the design and replacement of four bridge structures and widening and adding lanes to several highway sections.

Two of the bridges will be constructed using accelerated bridge construction, sometimes called the ABC method. It involves the use of advanced technologies to assemble a bridge offsite and then transport it to site for installation, said Joe Cutillo, chief executive of Sterling.

“This sizeable project gives us the opportunity to showcase our highly differentiated accelerated bridge construction capabilities,” said Cutillo. “ABC…dramatically shortens the amount of time it takes to replace a bridge, which translates into substantially reduced traffic impacts and inconvenience to motorists in the area around a job site. Additionally, ABC substantially improves work-zone safety for both drivers and contractor personnel and minimises environmental impact, relative to conventional bridge construction methods.”

According to the website of Ralph L. Wadsworth Construction, the company is “a pioneer” in accelerated bridge construction and reduced construction schedules and traffic disruptions through lateral slides, bridge launches and self-propelled modular transporters (SPMTs), which can allow bridge replacements to be completed in a single 24-hour closure.

Among the company’s projects is the longest two-span bridge ever moved by SPMTs in the western hemisphere - the Sam White Bridge on Utah’s I-15 corridor expansion project. The 354-foot (105m), two-span steel girder Sam White Bridge over the Interstate I-15 in the city American Fork was designed by Michael Baker International engineering consultancy. The bridge was built in a staging area about 500 feet (152m) from the original structure and then moved into place in about five hours during the night using self-propelled modular transporters.

Sterling Construction’s various subsidiaries specialise in heavy civil, specialty services and residential projects in the primarily across southern US states, the Rocky Mountain region, California and Hawaii.

For more information on companies in this article

Related Content

  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Northern Spire wins award from UK’s Association for Project Management
    November 30, 2018
    The Northern Spire bridge in Sunderland, northern England, has beaten off stiff competition to win another national construction and engineering award. The Spire, which opened in August this year at a cost of €132 million, was named Project of the Year: Engineering, Construction and Infrastructure 2018 by the UK’s Association for Project Management. The award is the latest honour for Sunderland’s 105m-tall cable-stayed bridge which links Castletown on the north side of the River Wear with Pallion.
  • Delcan wins Concrete Canada 2012 Structural Design Innovation Award
    February 21, 2013
    Delcan, a multi-disciplinary engineering, planning, management and technology firm, has been awarded Concrete Canada’s 2012 Structural Design Innovation Award for their work on the Whitemans Creek Bridge near Brantford, Ontario. Completed in 2011, Delcan, as Engineer of Record, worked collaboratively with the Ontario Ministry of Transportation to complete the replacement of the Bridge. By using what were described as accelerated bridge construction techniques, the Bridge was constructed in only seven weeks,
  • First half of Renfrew Bridge arrives by barge
    May 10, 2024
    VIDEOS: Graham Construction is building the swing Renfrew Bridge for Renfrewshire Council, Scotland, as part of the €137m Clyde Waterfront and Renfrew Riverside development project.