Skip to main content

Staffordshire road improvements planned

Staffordshire road improvements will commence shortly.
By MJ Woof July 29, 2024 Read time: 2 mins
Road works are planned at Branston in Staffordshire


A scheme bringing major improvements to a key Staffordshire junction in the UK is progressing on schedule, with the latest traffic management changes set to take place shortly.

The multi-million-pound project will ease congestion and increase capacity around the Branston Interchange A38 junction. It includes creating additional lanes around the junction, on the slip roads and on Branston Road and Parkway. New traffic signals will also be installed.

The next phase of the scheme will see overnight works taking place from Tuesday July 30th. These include works to remove the temporary safety barrier on the A38 northbound off slip road, which involves a crane followed by road surfacing works on the northbound off slip road and Branston Road. Later they will include works to then reinstall the temporary safety barrier on the north bound on slip road. During these works, the northbound off slip, northbound on slip road and Branston Road will be closed overnight from 8pm to 6am with signed diversions in place.

A £6 million allocation from UK Government funding and a significant contribution from the main developer of the Branston Locks site, Nurton Developments, are funding the scheme. Work is set to be completed in spring 2025. In addition to improving traffic flow around the junction, the project provides key transport infrastructure for ongoing development at Branston Locks and Burton’s future economic growth.

Staffordshire County Council’s cabinet member for strategic highways Mark Deaville said: “This project is delivering significant improvements to what is a busy junction and one of the main transport gateways to Burton. “Not only will it improve traffic flow around the junction but support Burton and Staffordshire’s economic growth. “We understand there will be some disruption while traffic management is in place, for which we’d like to apologise for, but it is necessary to enable us to move forward in bringing future growth and prosperity to Burton and Staffordshire.”

The county council recently upgraded Burton’s northern A38 junction at Claymills and is making further improvements along the northern gateway route this year together with improvements on the east-west A511 to ensure all other routes into the town are accessible during the Branston works.
 

Related Content

  • Morocco’s minister for Equipment and Transport discusses the IRF Marrakech conference
    April 3, 2013
    The magic of Morocco will form an idyllic backdrop for one of the landmark events on this year’s IRF calendar: the major regional conference focusing on North Africa & the Mediterranean which is being hosted in Marrakech on 19-20 March. Abdelaziz Rabbah, the Moroccan minister of Equipment & Transport will set the tone by welcoming delegates to a special high-level segment, which will open the event in the presence of dignitaries and senior officials drawn from throughout the region. This will include keynot
  • Illuminated road studs deliver tidal flow safety
    February 14, 2012
    Cornwall's Saltash Tunnel on the A38 trunk road is a crucial link between the county, and the neighbouring county of Devon, and is used by 38,000 motorists per day. Opened in 1988, the 410m long road tunnel in south-west England, is a single bore with three traffic lanes, and is part of the tidal flow system across the three-lane Tamar Bridge. The central lane has a speed limit of 30mph (48km/hour) and operates as a reversible lane to cope with holiday and rush hour traffic.
  • Illuminated road studs deliver tidal flow safety
    May 2, 2012
    Cornwall's Saltash Tunnel on the A38 trunk road is a crucial link between the county, and the neighbouring county of Devon, and is used by 38,000 motorists per day. Opened in 1988, the 410m long road tunnel in south-west England, is a single bore with three traffic lanes, and is part of the tidal flow system across the three-lane Tamar Bridge. The central lane has a speed limit of 30mph (48km/hour) and operates as a reversible lane to cope with holiday and rush hour traffic.
  • New funding for 44 infrastructure projects
    December 26, 2024
    New funding awards escalate the launch of 44 major infrastructure projects.