Skip to main content

St Petersburg plan

Over US$100 million is being budgeted for a new interchange in the Russian city of St Petersburg.
March 2, 2012 Read time: 1 min
Over US$100 million is being budgeted for a new interchange in the Russian city of St Petersburg. The project involves an upgrade to the Pirogovskaya Embankment at the interchange ramp for the Sampsonievsky bridge. The project is expected to be complete by June 2012. The work involves upgrading the roadway for the Pirogovskaya Embankment, rebuilding some existing structures and driving a new tunnel under the ramp for the Sampsonievsky Bridge. The upgrade will double capacity for the Pirogovskaya Embankment to 8,730 vehicles/hour. After work is complete on the interchange, the city is planning to begin construction of Kronverksky Corridor and a tunnel under Kamennoostrovsky Prospect.

Related Content

  • Funding pledge boost for St Petersburg city centre bypass plans
    November 11, 2013
    St Petersburg’s city centre bypass is a vital step closer to being realised after the Russian city’s committee on economic policy and strategic planning said it will be submitting proposals for co-financing of the project to the Ministry of Transport. The bypass highway, earmarked to be built along the Obvodny Canal, is expected to cost US$1.53 billion (RUB 50 billion). An application for federal budget funds will likely be filed in 2014. The project, which stipulates construction of embankments, bridges,
  • St Petersburg plans road connections spending
    February 13, 2012
    The authorities in the Russian city of St Petersburg are setting aside funds for road construction and repairs for 2012.
  • Flatiron wins Winnipeg interchange project in Canada
    August 5, 2015
    US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank
  • St Petersburg's transport plan
    February 29, 2012
    The authorities in Russian city St Petersburg have set a new budget for road repairs and highway upgrades in 2011.