Skip to main content

St Petersburg link may include tunnel

A new alignment is being considered for a major project in Russia’s second city, St Petersburg. A tunnel stretch running under the Neva River is being considered as an alternative route for the Eastern High Speed Diameter (EHSD) project. This tunnel would take the place of the fixed bridge, which has been criticised by some for its impact on the city’s skyline. However building the tunnel would increase the cost of the project by around US$52 million.
September 28, 2017 Read time: 1 min

A new alignment is being considered for a major project in Russia’s second city, St Petersburg. A tunnel stretch running under the Neva River is being considered as an alternative route for the Eastern High Speed Diameter (EHSD) project. This tunnel would take the place of the fixed bridge, which has been criticised by some for its impact on the city’s skyline. However building the tunnel would increase the cost of the project by around US$52 million. The 22.6km EHSD will carry 100,000 vehicles/day and will feature three lanes in either direction when it is complete. The route will connect with the Western High-Speed Diameter (WHSD) and the two will serve as a bypass around St Petersburg.

Related Content

  • Widening of key highway planned for St Petersburg
    October 21, 2015
    Plans are underway to widen a stretch of the Western High-Speed Diameter (WHSD) around St Petersburg in Russia. The northern section of the WHSD, near Beloostrov, will be widened from four to six lanes. The work will be carried out by Northern Capital Highway (NCH), a consortium owned by VTB and Gazprombank. This consortium is currently building the central section of the WHSD, as well as operating the tolled northern and southern sections under a PPP concession agreement. The project will cost around US$15
  • Opening St Petersburg's key tollway ring road
    May 15, 2012
    A new section of Western High Speed Diameter (WHSD) highway from the Ring Road (KAD) to the Hyundai plant in Kamenka, has been opened to traffic in St Petersburg. The WHSD and KAD interchange will be completed by 2012 when the entire third phase of the highway will be built. The US$7.23 billion WHSD Tollway in the city is sponsored by the Federal Road Agency and it is said to be one of the most important means of solving the city’s transport problems. It is a strategic investment project to develop the ci
  • Alleviating Moscow's ring road congestion
    April 10, 2012
    The US$10.5 billion CKAD (Moscow Region Ring Road), being planned and procured under the direction of the Ministry of Transport of Russia, is just one of the roads highlighted at the Moscow Forum.
  • Alleviating Moscow's ring road congestion
    February 20, 2012
    The US$10.5 billion CKAD (Moscow Region Ring Road), being planned and procured under the direction of the Ministry of Transport of Russia, is just one of the roads highlighted at the Moscow Forum.