Skip to main content

SSL settles legal issues, Champlain Bridge to open December 21

Montreal will get its new Champlain Bridge just before Christmas, a date agreed upon by the Canadian government and the SNC-Lavalin-led consortium. The agreement settles an outstanding lawsuit that the Consortium had filed regarding costs increases of around US$186.5 million relating to the transportation of oversized parts and delays to the bridge's construction, according to media reports. Last month SNC-Lavalin, head of the Signature on the Saint-Laurent Group (SSL), had said that the bridge over the
April 18, 2018 Read time: 2 mins
Merry Christmas to Montreal: Champlain Bridge replacement opens in December

Montreal will get its new Champlain Bridge just before Christmas, a date agreed upon by the Canadian government and the SNC-Lavalin-led consortium.

The agreement settles an outstanding lawsuit that the Consortium had filed regarding costs increases of around US$186.5 million relating to the transportation of oversized parts and delays to the bridge's construction, according to media reports.

Last month SNC-Lavalin, head of the Signature on the Saint-Laurent Group (SSL), had said that the bridge over the St Lawrence River and Seaway canal would open in December but gave no date. The December 21 date it newly three weeks later than planned.

Failure to open the 3.4km-long bridge to vehicular traffic on time means the consortium would face stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $310,000 per day.

No details of the settlement were released.

Cost of the entire 6km corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments.

The federal Canadian government signed a public-private partnership deal with the SNC-Lavalin consortium Signature on the Saint-Laurent Group in mid-2015 for the group to design, build, finance and maintain the New Champlain Bridge Corridor project. SNC-Lavalin is a 50% partner in SSL which will operate and maintain the bridge until October 2049. Other SSL partners are Hochtief, Flatiron, Dragados Canada and Grupo ACS.

Meanwhile, SSL entered into a date-certain, fixed-priced contract with a construction joint venture of which SNC-Lavalin is again a 50% partner.

The new bridge has six vehicle lanes plus two lanes running in the middle of the bridge for electric public transit trains. The bridge runs from the Ile des Soeurs to Brossard, immediately downstream from the existing Champlain Bridge.

Every year, around 50 million vehicles cross the old bridge, Canada’s most heavily travelled bridge and a major route for traffic to and from the US. Construction of the existing steel truss cantilever bridge, as well as accompanying approaches and the Bonaventure Expressway, started in 1957 and finished in 1962. Of the old 14.5km-long complex, the bridge is 7.4km.

Related Content

  • Greenlight for Vietnam’s Cat Lai Bridge in 2020
    September 4, 2019
    An agreement has been reached in Vietnam for construction of a bridge over the Dong Nai River close to Ho Chi Minh City. The proposed 4.5km, six-lane cable stayed structure – the Cat Lai Bridge - could cost as much as US$268 million. It would replace the Cat Lai ferry service that runs between Nhon Trach District of Dong Nai Province and District 2 of Ho Chi Minh City. The bridge would also become a major route to the international airport, according to local media. The ferry service carries on averag
  • Chile highway link faces future issues
    January 24, 2017
    Chile’s busy Route 68 between capital Santiago and the country’s main port of Valparaiso faces an uncertain future. The 110km highway carries heavy traffic volumes and is close to its capacity of 4,500 vehicles/hour at peak periods, with extensive works required to improve the route. The work to upgrade Route 68 is expected to cost up to US$170 million, with eight sections of the highway in particular need of attention. The tender process for the upgrade work will open shortly. The Chilean Government opt
  • Netherlands: Hochtief, Fluor and Heijmans win Zuidasdok contract
    January 26, 2017
    Germany's Hochtief and US-based Fluor have been awarded a preliminary construction contract for the Zuidasdok regeneration project in Amsterdam. Hochtief and Fluor will each secure 42.5% of the €990 million contract while Dutch contractor Heijmans will secure 15%. Zuidasdok - a joint project by the city of Amsterdam, ProRail and Rijkswaterstaat – will redevelopment the area around Amsterdam Zuid train and metro station, including major changes to the A10 motorway. ProRail is a government organisati
  • Thames Crossing tunnels tendered
    November 13, 2020
    The Crossing will almost double road capacity across the Thames River near London.