Skip to main content

Southern Africa bridge connection for Zambia and Botswana

Work is close to completion for the Kazungula Bridge, which will span the Zambezi River and connect Zambia and Botswana.
April 6, 2018 Read time: 1 min

Work is close to completion for the Kazungula Bridge, which will span the Zambezi River and connect Zambia and Botswana. However the new bridge link is important for Southern Africa as a whole as it will also facilitate improved traffic flow for Namibia and Zimbabwe, which have borders close at hand. The project for the 923m long bridge is costing around US$234 million and the link will carry both road and rail traffic. The new bridge forms part of the North South Corridor (NSC) in the SADC region. The NSC connection itself forms part of a series of infrastructure works, intended to help develop the region’s economy. In all the NSC will help develop trade and transport for eight countries in the SADC group. countries, and the Kazungula Bridge will provide a key link in the route running from South Africa’s port of Durban to Botswana, Zambia, Zimbabwe, Malawi, the DRC, and Mozambique, finally linking with Dar-es-Salaam in Tanzania. Because of the route’s importance, minimising customs delays has been crucial. And a new three-way border post at Kazunula in Zambia will help reduce crossing times between Botswana, Zambia and Zimbabwe and has been set up jointly by the countries.

Related Content

  • Lower Thames Crossing contractor shortlist
    September 27, 2021
    The contractor shortlist has been announced for part of the Lower Thames Crossing.
  • Zimbabwe highway project faces delay
    July 12, 2018
    The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract. The hig
  • Moscow-Kazan highway plans
    June 17, 2020
    The Moscow-Kazan highway plans form part of the nation’s future economic recovery.
  • Algeria key route completion
    November 9, 2017
    Construction work on Algeria’s East-West Highway project is finally drawing to a close.