Skip to main content

South Korea expressway project launch date to be revealed by government

In the second half of 2014, the launch date for an expressway project connecting Sejong and Seoul will be announced by the South Korean government. The expressway is set to ease traffic congestion in the Jungbu and Gyeongbu motorways. The project will cost an estimated US$6.57 billion (KRW 6.7 trillion), with the expressway spanning 129kms. It is due for completion by 2022.
June 23, 2014 Read time: 1 min
In the second half of 2014, the launch date for an expressway project connecting Sejong and Seoul will be announced by the South Korean government. The expressway is set to ease traffic congestion in the Jungbu and Gyeongbu motorways. The project will cost an estimated US$6.57 billion (KRW 6.7 trillion), with the expressway spanning 129kms. It is due for completion by 2022.

Related Content

  • Workzones benefit from new mobile speed enforcement technology
    April 10, 2012
    A variety of new technology for temporary speed zones during major highway projects across the globe is about to hit the market, while other proven systems remain in demand. Guy Woodford reports. The D-Cam P is one of four new mobile speed reading products for temporary speed zones being launched this month by Truvelo. Deployable solely as a speed camera or at a red light intersection to monitor red light offences, the D-Cam P can also act as a speed camera on the green and amber light phases. The machine d
  • Philippines expressway connector project under construction
    March 11, 2019
    Construction work is starting in the Philippines for the new link that will connect the North Luzon Expressway (NLEx) and the South Luzon Expressway (SLEx). The project is costing nearly US$430 million, with the link being built by local toll road firm NLEX Corp. The new link road will be 8km long, running from the end of Harbor Link in Caloocan City to the Polytechnic University of the Philippines (PUP) in Santa Mesa of Manila. The road link will be elevated and the work is due for completion in 2021.
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t