Skip to main content

South Korea expressway project launch date to be revealed by government

In the second half of 2014, the launch date for an expressway project connecting Sejong and Seoul will be announced by the South Korean government. The expressway is set to ease traffic congestion in the Jungbu and Gyeongbu motorways. The project will cost an estimated US$6.57 billion (KRW 6.7 trillion), with the expressway spanning 129kms. It is due for completion by 2022.
June 23, 2014 Read time: 1 min
In the second half of 2014, the launch date for an expressway project connecting Sejong and Seoul will be announced by the South Korean government. The expressway is set to ease traffic congestion in the Jungbu and Gyeongbu motorways. The project will cost an estimated US$6.57 billion (KRW 6.7 trillion), with the expressway spanning 129kms. It is due for completion by 2022.

Related Content

  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Philippines planning series of highway projects
    August 10, 2017
    A series of major highway projects are now being planned in the Philippines. The largest of this most recent set of highway projects to be announced is for the US$1.24 billion NLEx-Cavitex Port Expressway Link put forward. Measuring 15km the route would be constructed featuring four lanes. This proposed link would connect the Cavite Expressway and North Luzon Expressway in Metro Manila. The proposal for the project has been made by Manila North Tollways, a subsidiary of Metro Pacific Investments.
  • China’s undersea tunnel project is being planned
    August 20, 2018
    Plans are being drawn up for the project to drive a new undersea tunnel in Southern China to improve transport links between Shenzhen and Guangzhou. The tunnel itself will be around 1.1km long but the project will also include building a 4.45km stretch of road in the Dachan Bay area and a 2.5km stretch of road in Qianhai.
  • Slovakia keeps to planned D1 Hubova-Ivachnova completion date
    August 19, 2019
    Slovakia’s national motorway company NDS has confirmed the D1 motorway between Hubova and Ivachnova is on schedule to be completed by mid-2022. Work on the 15km stretch of road – effectively a bypass for the town of Ruzomberok –was started in 2013. But a major landslide in 2015 halted work, pushing back completion from 2017 to 2022 at the latest estimate. Montenegrin media report that the cost of the project has grown from €227 million in 2013 to nearly €289 million. Construction is being carried out