Skip to main content

South Carolina sets out 10 year transport plan

The problem of inadequate bridges is widespread across US states but South Carolina is devising a 10-year plan that will address the structures in most need of attention. The programme of works will also tackle roads that have been identified as being in inadequate condition.
July 10, 2017 Read time: 1 min

The problem of inadequate bridges is widespread across US states but South Carolina is devising a 10-year plan that will address the structures in most need of attention. The programme of works will also tackle roads that have been identified as being in inadequate condition. The programme of works is being set out by the South Carolina Department of Transportation (SCDOT), with the work being paid for by slight increases in the taxes for fuel and vehicle sales. The state commenced its bridge replacement programme in 2013; however the additional revenue from these further taxes will allow another 465 bridges to be repaired or replaced in the 10-year period. In addition SCDOT is improving 224km of Interstate links in the state at present, while further plans call for improved safety features to be installed on rural roads such as adding shoulders or installing guard rail and rumble strips.

Related Content

  • ERF urges greater maintenance of Europe’s road signs to save lives
    March 21, 2016
    ERF has launched a position paper to advocate better maintenance of Europe’s traffic signs. Vertical signage is an essential element not only of a modern and well-maintained road infrastructure, but also of a safe and functional road network. Road signs help regulate traffic, provide crucial visual guidance and give drivers important preview especially during night-time conditions. Well maintained and efficient signage becomes even more necessary when taking into account the ageing population of Europe, in
  • Developments in concrete road construction
    February 7, 2012
    Innovative developments are pushing forward concrete road construction techniques. The concrete road sector looks to benefit from some key innovations and developments now coming to market or being employed in different territories. Irregular weather and environmental conditions can alter the rate at which concrete cures, with a risk of plastic shrinkage cracks that can compromise the integrity of a pavement. Contractors cannot control the environmental conditions of a paving project and when weather patter
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b