Skip to main content

South Carolina highway deal for Michael Baker International

Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County. The section of I-20 is a main artery into and
June 21, 2016 Read time: 2 mins
Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County.

The section of I-20 is a main artery into and out of Columbia and currently experiences heavy congestion at peak periods. When the project is complete, the stretch of I-20 will be expanded from four to six lanes in each direction. The new section of highway will better accommodate traffic patterns flowing into the city and potentially reduce the daily rush hour commute by nearly 50 percent.

Michael Baker’s Construction Engineering & Inspection team, led by project engineer Tim Sewell, will oversee contract management, inspection and testing services, and verification surveys. Given the roadway’s significance to local commuters, Michael Baker will also assist SCDOT in keeping residents, local businesses and other key regional stakeholders informed of the roadway project’s progress and anticipated lane restrictions or delays, particularly during the construction phase to ensure minimal disruptions. This might include the establishment of a variety of channels, including signage and informational meetings with the public.

The design and engineering phase of the project is expected to begin in the summer of 2016. The roadway project is expected to be complete by the third quarter of 2018.

Related Content

  • Concrete paving a smoother surface using machine control technology
    May 17, 2017
    Innovative technology has been used to deliver a smooth concrete road surface on a busy stretch of highway in Nebraska. Much-needed work on a busy section of Interstate 80 has been carried out in Nebraska to improve the road surface. This is one of the most important highways in the US, providing a link that stretches right across the country between the east and west coasts. This busy highway carries a high percentage of heavy truck traffic as it is a vital transport route. However this constant flow of la
  • Wacker Neuson sees business growth with strong results
    November 10, 2017
    The Wacker Neuson Group is reporting a strong third quarter performance for 2017. The company’s latest results reveal a marked increase in revenue and earnings and says it remains positive about the fourth quarter of 2017. Wacker Neuson says it expects its revenue and earnings forecast for the current fiscal year to come in at the higher end of previous forecasts. The Wacker Neuson Group reported revenue of € 378.7 million for the third quarter of 2017. This corresponds to an increase of 20% over the €315.
  • Historic bridge upgrade in Minneapolis
    July 28, 2022
    A historic bridge upgrade in Minneapolis is close to completion.
  • Asset management can be optimised with new technology
    August 22, 2013
    An array of asset management technologies and capabilities are now available to help clients optimise infrastructure assessments. Global survey and geotechnical group, Fugro, has signed a multi-year agreement with Dutch pavement consultant, KOAC•NPC. This move will see the firms combine capabilities to undertake highway surface condition contracts in the Netherlands. Under the agreement, Fugro will collect surface condition data using its ARAN road scanning vehicle. KOAC•NPC, will carry out the post pro