Skip to main content

South Carolina highway deal for Michael Baker International

Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County. The section of I-20 is a main artery into and
June 21, 2016 Read time: 2 mins
Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County.

The section of I-20 is a main artery into and out of Columbia and currently experiences heavy congestion at peak periods. When the project is complete, the stretch of I-20 will be expanded from four to six lanes in each direction. The new section of highway will better accommodate traffic patterns flowing into the city and potentially reduce the daily rush hour commute by nearly 50 percent.

Michael Baker’s Construction Engineering & Inspection team, led by project engineer Tim Sewell, will oversee contract management, inspection and testing services, and verification surveys. Given the roadway’s significance to local commuters, Michael Baker will also assist SCDOT in keeping residents, local businesses and other key regional stakeholders informed of the roadway project’s progress and anticipated lane restrictions or delays, particularly during the construction phase to ensure minimal disruptions. This might include the establishment of a variety of channels, including signage and informational meetings with the public.

The design and engineering phase of the project is expected to begin in the summer of 2016. The roadway project is expected to be complete by the third quarter of 2018.

Related Content

  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.
  • Salini Impregilo morphs into Webuild
    May 19, 2020
    The name of a major player on the international construction scene has changed.
  • Brazilian road spend dips slightly for 2015
    July 9, 2015
    Brazil will spend at least US$1.63 billion in privately operated federal road infrastructure projects in 2015. This is down slightly, from $1.82 billion spent in 2014, according to estimates by the land transport agency NTT. Work this year includes a stretch of the BR-050 motorway operated by MGO, which already has seen around $104 million. Road operator Concer, which administers sections of the BR-060, BR-153 and BR-262, invested nearly $88 million between 2014 and the first quarter of 2015. Arter
  • Mali’s international airport sees improvement
    August 21, 2013
    A three-year modernisation programme at Bamako-Sénou international airport will improve the facility and allow larger aircraft and greater passenger numbers. The Malian Government has been undertaking a vast extension of the airport with the aim of being able to accommodate over a million passengers/year and all sizes of passenger aircraft. The project is being handled by MCA-Mali, a consortium led by RAZEL-BEC and also including the Vinci Group, which is active in Mali. Guillaume Derousseau, constructio