Skip to main content

South Carolina highway deal for Michael Baker International

Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County. The section of I-20 is a main artery into and
June 21, 2016 Read time: 2 mins
Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County.

The section of I-20 is a main artery into and out of Columbia and currently experiences heavy congestion at peak periods. When the project is complete, the stretch of I-20 will be expanded from four to six lanes in each direction. The new section of highway will better accommodate traffic patterns flowing into the city and potentially reduce the daily rush hour commute by nearly 50 percent.

Michael Baker’s Construction Engineering & Inspection team, led by project engineer Tim Sewell, will oversee contract management, inspection and testing services, and verification surveys. Given the roadway’s significance to local commuters, Michael Baker will also assist SCDOT in keeping residents, local businesses and other key regional stakeholders informed of the roadway project’s progress and anticipated lane restrictions or delays, particularly during the construction phase to ensure minimal disruptions. This might include the establishment of a variety of channels, including signage and informational meetings with the public.

The design and engineering phase of the project is expected to begin in the summer of 2016. The roadway project is expected to be complete by the third quarter of 2018.

Related Content

  • $337 million NC road deal for Lane
    July 18, 2025
    Lane Construction has won a $337 million road deal for NC.
  • Key SR-91 highway upgrade underway in California
    December 16, 2013
    In the US state of California, construction is now underway for the State Route 91 (SR-91) Corridor Improvement Project. This improved section for SR-91 will run through the Corona and Riverside, both of which are located in Riverside County. The project will extend the SR-91 Tolled Express Lanes in Orange County into Riverside County, a distance of 17.6km. This includes a 13km stretch into Riverside County on SR-91, with a 5km flyover connecting to Interstate 15 from SR-91. Riverside County Transportation
  • Oklahoma turnpike project for Atkins
    April 12, 2018
    Atkins, part of the SNC-Lavalin Group, is providing construction management services for the Oklahoma Turnpike Authority (OTA).
  • Rebuild project for historic Pennsylvania bridge
    September 10, 2015
    Rebuilding work is planned for a historic bridge in the US state of Pennsylvania to ensure it remains able to carry current traffic volumes. The work is being managed by consulting engineer Michael Baker International. Pennsylvania Department of Transportation (PennDOT) selected Michael Baker International for the US$5 million engineering and design project that will focus on the western spans of the Market Street Bridge in Harrisburg. Rehabilitating this critical traffic artery in Pennsylvania's capital re