Skip to main content

South Africa’s Msikaba Bridge tender reopening

The tender process for the Msikaba Bridge project in South Africa is now being reopened. This is being handled by the South African National Roads Agency (Sanral). The project is costing US$128.25 million and involves the construction of a 580m long suspension bridge. The structure will span the Msikaba River and will be located around 23km to the east of the town of Lusikisiki. Once complete this will be the longest suspension bridge in South Africa. According to Sanral, the tender process is now likely to
November 9, 2017 Read time: 1 min

The tender process for the Msikaba Bridge project in South Africa is now being reopened. This is being handled by the South African National Roads Agency (Sanral). The project is costing US$128.25 million and involves the construction of a 580m long suspension bridge. The structure will span the Msikaba River and will be located around 23km to the east of the town of Lusikisiki. Once complete this will be the longest suspension bridge in South Africa. According to Sanral, the tender process is now likely to prove successful and will remain open for bids until March 2018.

Related Content

  • Kentucky-Indiana bridge project
    April 19, 2023
    Progress is being seen with the Kentucky-Indiana bridge project.
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • Vejdirektoratet tenders more Kalundborg
    June 6, 2025
    The Danish Road Directorate said the work on stage three of the Kalundborg Motorway will include a new junction facility as well as a large fauna underpass, a road bridge and two pedestrian bridges.