Skip to main content

South Africa bridge project restarting

Work on a key South African bridge project is now restarting.
By MJ Woof June 16, 2020 Read time: 2 mins
Construction of the Msikaba bridge in South Africa’s Eastern Cape was originally expected to take 33 months to complete – image courtesy © Ingo Menhard, Dreamstime.com

Construction work on the Msikaba Bridge project in South Africa has now recommenced. Work had previously stalled on the bridge, located in the Eastern Cape, due to the Corona Virus pandemic.

However, social distancing measures have now been introduced to protect personnel so construction is once more underway. The foundations are being built first for the bridge, which will feature towers 127m in height and a central span of 580m.

The Msikaba Bridge will be South Africa’s longest cable-stayed type structure once complete. However, the Maputo-Catembe Bridge in Mozambique is designed with a central span of 680m, making it the longest in Africa. The gorge is 195m deep, making the bridge one of the highest in the world.

The project is costing US$111.7 million and the bridge will span the Msikaba Gorge, close to the town of Lusikisiki. The work is being carried out jointly the local subsidiary of Portuguese contractor Mota-Engil Construction and the South African firm Concor Infrastructure.

Construction of the bridge is forming part of the N2 Wild Coast Toll Road project being handled by the South African National Roads Agency. Construction of the toll road is intended to help develop the area economically.

Also being built as part of the N2 Wild Coast Toll Road project is the Mtentu Bridge. Once the new route is complete, it will cut the driving distance by some 85km.

Related Content

  • South Africa bridge deal for joint venture
    September 21, 2018
    The contract has been awarded for the construction of a bridge spanning South Africa’s Msikaba Gorge. The project is expected to cost US$110.5 million and the package of works was awarded by the South African National Roads Agency (SANRAL). A Portuguese and South African joint venture partnership, Concor Mota-Engil, will carry out the work, which will commence in February 2019 and is expected to take 33 months to complete. The bridge will feature a main span of some 580m, making it the longest cable-stayed
  • South Africa bridge deals for Msikaba and Mtentu rivers by end 2016
    August 1, 2016
    The South African National Roads Agency (SANRAL) said it is on track to announce tender winners for two bridges, across the Msikaba River and Mtentu River, by the end of the year. The Msikaba River Bridge will be constructed on the N2 Wild Coast Toll Road and will consist of a cable-stayed 580m-long structure spanning a deep gorge. The Mtentu River Bridge, also on the N2 Wild Coast Toll Road and around 12km to the north of Msikaba River, is expected to be a concrete structure and nearl.y 1.2kkm long.
  • South Africa’s Msikaba Bridge tender reopening
    November 9, 2017
    The tender process for the Msikaba Bridge project in South Africa is now being reopened. This is being handled by the South African National Roads Agency (Sanral). The project is costing US$128.25 million and involves the construction of a 580m long suspension bridge. The structure will span the Msikaba River and will be located around 23km to the east of the town of Lusikisiki. Once complete this will be the longest suspension bridge in South Africa. According to Sanral, the tender process is now likely to
  • New South Africa bridge project for STRABAG
    September 6, 2017
    Contractor STRABAG is to work on the project to build a new bridge connection in South Africa. This structure is of note as it will be Africa’s highest bridge at 223m high. The 1,132m long bridge will span the Mtentu River in eastern South Africa, close to the town of Flagstaff. The contract has a value of around €106 million and the construction work is expected to take 40 months to complete. STRABAG International is working with the South African contractor AVENG Grinaker-LTA on the project