Skip to main content

South Africa bridge deals for Msikaba and Mtentu rivers by end 2016

The South African National Roads Agency (SANRAL) said it is on track to announce tender winners for two bridges, across the Msikaba River and Mtentu River, by the end of the year. The Msikaba River Bridge will be constructed on the N2 Wild Coast Toll Road and will consist of a cable-stayed 580m-long structure spanning a deep gorge. The Mtentu River Bridge, also on the N2 Wild Coast Toll Road and around 12km to the north of Msikaba River, is expected to be a concrete structure and nearl.y 1.2kkm long.
August 1, 2016 Read time: 2 mins
The South African National Roads Agency (SANRAL) said it is on track to announce tender winners for two bridges, across the Msikaba River and Mtentu River, by the end of the year.

The Msikaba River Bridge will be constructed on the N2 Wild Coast Toll Road and will consist of a cable-stayed 580m-long structure spanning a deep gorge.

The Mtentu River Bridge, also on the N2 Wild Coast Toll Road and around 12km to the north of Msikaba River, is expected to be a concrete structure and nearl.y 1.2kkm long. It will comprise a 260m main span constructed as a balanced cantilever with main piers around 160m high.

The N2 Wild Coast Toll Highway project extends over 410km between East London in Eastern Cape province and the Mtamvuna River, south of Port Edward in KwaZulu-Natal, running roughly parallel to the east coast.

Related Content

  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31
  • Ghana bridge project receiving Japan loan
    December 8, 2016
    A loan of US$100 million will help pay for a bridge spanning the Volta River in Ghana.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Tappan Zee takedown into the Hudson River
    January 17, 2019
    A controlled explosion demolished the eastern span of the old cantilever Tappan Zee Bridge across the Hudson River near New York City. The bridge, nearly 5km long, was opened in 1955 to carry traffic between the southern New England area and other regions west of the Hudson. Around 140,000 vehicles used the bridge daily. But the old bridge had deteriorated substantially and would have been too expensive to maintain or keep open for lighter traffic use. It became redundant after the new bridge of the