Skip to main content

Slovenia-Austria tunnel project contractor selection

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.
May 17, 2019 Read time: 1 min

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.

Related Content

  • Chile-Argentina Agua Negra Tunnel progress
    February 16, 2018
    The names of the contractors offering bids for the new Agua Negra Tunnel project connecting Chile and Argentina will be revealed in March 2018. Several firms have already expressed a keen interest in this major engineering project. Contractors that have expressed interest include CRS, a consortium comprising China Railway Tunnel Group and Benito Roggio e Hijos. In addition, Ingenieria y Construccion Sigdo Koppers and OHL are also interested in the project as are the firms Rovella and Condotte. The project
  • Moscow highway link under construction
    February 26, 2021
    An important highway link is now under construction in Moscow.
  • No Vienna-Prague link in Austria-Czech road agreement
    October 2, 2014
    A direct motorway between Austria’s capital, Vienna, and the Czech Republic capital, Prague, is not part of a new agreement on road connections between the two nations. The agreement formed by Austrian and Czech transport ministers Erwin Pröll and Antonin Prachar states that a four-lane A5 motorway will only go as far as Poysbrunn on the Austrian side, and will then continue with two lanes towards the Czech border. The overall road link is due to be completed in 2017.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.