Skip to main content

Slovenia-Austria tunnel project contractor selection

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.
May 17, 2019 Read time: 1 min

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.

Related Content

  • Terex Trucks work on Austria’s North Autobahn A5 Vienna to Brno
    January 27, 2017
    Regional contractor Windisch has put five Terex TA300 articulated haulers to work shifting 1.4 million m3 of earth on the A5 motorway extension in Austria. The five 28tonne capacity TA300s have been selected by local contractor Windisch to take part in the expansion of the North Autobahn (A5) which will form a modern highway between Vienna in Austria and Brno in the Czech Republic. Austrian distributor Mlecka Construction, just outside of Vienna in Oeynhausen, supplied the vehicles that work 12-hour s
  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.
  • Colombia’s tunnel of woe faces further setback
    May 19, 2017
    The troubled tunnel construction project in Colombia to build the La Linea link has faced yet a further setback in its long tale of woe. The tender for the completion of the final 12% of the tunnel project has not managed to attract any interest from contractors. The budget for this work is an estimated US$77 million. A new tender process is being launched, with a submission deadline of 6th June 2017 and planned winner announcement on 4th July 2017. The contractor that had been building the tunnel failed to
  • Dominican Republic highway project
    June 15, 2021
    A key Dominican Republic highway project is planned