Skip to main content

Slovenia-Austria tunnel project contractor selection

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.
May 17, 2019 Read time: 1 min

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.

Related Content

  • South Africa road repair deals for contractors
    March 13, 2018
    A series of road repair contracts are being carried out now in South Africa. Bakwena, a road construction and maintenance firm, is maintaining and upgrading road infrastructure along the 385km of the N1N4 in a deal worth US$84.6 million. Meanwhile the contractor Raubex Construction is working on a $49.22 million project for a new link between the M17 and R512 routes. In addition, Raubex Construction is carrying out $4.65 million of improvement works on the R511 interchange. Resurfacing of a stretch of the
  • Mumbai’s new coastal transport link
    July 6, 2022
    Mumbai’s new coastal road presents an ambitious and challenging project that will help improve the lives of the city’s inhabitants - Mike Woof writes
  • Serbia reduces cost of highway construction
    March 22, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget.
  • CRCP is first choice for Belgian highway
    November 28, 2012
    Dan Gilkes reports on a Belgian highway upgrade When the Ministry of Public Works in the Belgian State of Flanders decided to reconstruct and resurface 19km of the N49 Antwerp-Knokke Expressway, continuously reinforced concrete paving (CRCP) with an exposed aggregate surface was the natural material choice. Indeed exposed aggregate, with its high grip and low noise benefits, has been the first option for all motorway surfacing work in Belgium since the 1980s. However, the €15.65 million contract is not a li