Skip to main content

Slovenia-Austria tunnel project contractor selection

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.
May 17, 2019 Read time: 1 min

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.

Related Content

  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • Work starts on Banja Luka-Prijedor highway
    November 18, 2021
    The highway in Republika Srpska is part of the Banja Luka-Novi Grad motorway.
  • Construction commencing for Mersey gateway project
    September 15, 2014
    Work is now starting on the road links that will connect to the new Mersey Gateway Bridge, close to the UK city of Liverpool. The first work is being carried out at Junction 12 of the M56 in Runcorn, with workers commencing site clearance at the roundabout where the motorway joins the Weston Point Expressway (A557). This will take around six months to complete, with much of the work being carried out during off-peak traffic times so as to minimise congestion and this portion of the project should be finishe
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports