Skip to main content

Slovakia project is on schedule

Slovakia's Ministry of Transport, Construction and Regional Development, has reported that construction of the 12.28km long D3 highway stretch is on schedule. The section runs between Svrcinovec and Skalite and could be opened to traffic at the end of 2016. The stretch is one of the most difficult ones in terms of construction and includes an 84m tall bridge. This stretch of the highway will connect to the section between Skalite and the Polish border. The project is worth nearly €330 million.
March 14, 2016 Read time: 1 min
Slovakia's Ministry of Transport, Construction and Regional Development, has reported that construction of the 12.28km long D3 highway stretch is on schedule. The section runs between Svrcinovec and Skalite and could be opened to traffic at the end of 2016. The stretch is one of the most difficult ones in terms of construction and includes an 84m tall bridge. This stretch of the highway will connect to the section between Skalite and the Polish border. The project is worth nearly €330 million.

Related Content

  • Trans-Sahara highway upgrade project complete
    May 8, 2018
    Work has now been completed on Algeria’s upgrade of its 1,600km of the Trans-Sahara highway route.
  • Texas tollway projects commencing
    June 23, 2016
    A series of tolled highway projects are commencing in the US state of Texas. These projects are being coordinated with input from the Texas Department of Transportation. One project is worth US$330 million and involves adding tolled lanes to the existing State Highway 360. The second phase of this project would cost an additional $604 million and involve adding further tolled lanes, however funding has yet to be secured before it can progress further. Another project is for the construction of tolled lanes
  • Realising a dream
    February 20, 2012
    Shem Oirere reports on how major highway projects in eastern African will improve links and the economies of a number of countries in the region
  • STRABAG working on Slovakian highway
    December 16, 2013
    A consortium is now working on the construction of one stretch of Slovakia’s D1 highway. The section lies between Hričovské Podhradie and Lietavská Lúčka and the project is worth €427 million. The consortium comprises four companies; with Doprastav, Váhostav and STRABAG all holding equal 32% stakes of the contract and Metrostav having a minority 4% share. The work being carried out by Doprastav, Váhostav and STRABAG is equivalent to some €140 million each. The construction work is expected to take 48 months