Skip to main content

Slovakia project is on schedule

Slovakia's Ministry of Transport, Construction and Regional Development, has reported that construction of the 12.28km long D3 highway stretch is on schedule. The section runs between Svrcinovec and Skalite and could be opened to traffic at the end of 2016. The stretch is one of the most difficult ones in terms of construction and includes an 84m tall bridge. This stretch of the highway will connect to the section between Skalite and the Polish border. The project is worth nearly €330 million.
March 14, 2016 Read time: 1 min
Slovakia's Ministry of Transport, Construction and Regional Development, has reported that construction of the 12.28km long D3 highway stretch is on schedule. The section runs between Svrcinovec and Skalite and could be opened to traffic at the end of 2016. The stretch is one of the most difficult ones in terms of construction and includes an 84m tall bridge. This stretch of the highway will connect to the section between Skalite and the Polish border. The project is worth nearly €330 million.

Related Content

  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Two more construction tenders for Slovakia’s R2 by end of 2018
    November 7, 2018
    Arpad Ersek, Slovakia's Minister of Transport, said another two tenders for construction of two R2 expressway stretches will be called by the end of 2018. They will include the stretch Roznava-Jablonov nad Turnou with the Soroska tunnel and the Kosice, Saca-Kosicke Olsany. In both cases financing has been secured. They could be financed through a loan or through the PPP scheme (public-private partnership). Ersek added that the ministry should receive an additional funds of up to €200 million through r