Skip to main content

Slovakia highway section open to drivers

An important highway section in Slovakia is now open to drivers
By MJ Woof February 15, 2021 Read time: 1 min
A stretch of Slovakia’s D1 route is now open – image courtesy of © Sjankauskas, Dreamstime.com

A new 11km section of the D1 highway in Slovakia is now open to drivers. The stretch bypasses Zilina and connects Hricovske Podhradie with Lietavska Lucka. This section of the D1 includes the Zilina tunnel and the 2.5km Ovciarsko tunnel. The work cost €445.17 million and construction was carried out by a contracting consortium comprising Doprastav Metrostav, Strabag and Vahostav.

Construction of the tunnel sections posed challenges for the builders. 

The D1 forms part of the trans-European Network (TEN) and is Corridor 5, connecting Ukraine with the Venice, on the Mediterranean. The Slovakian section of the route connects Ukraine with Vienna and runs through Bratislava.

Related Content

  • Slovakia concerned over tenders for D1 Presov and D3 Cadca bypasses
    September 14, 2016
    The Slovakian government is examining bids for two tenders for motorway stretches D1 because of their higher-than-expected costs. The deal involves the Presov West - Presov South stretch and the D3 Cadca, Bukov - Svrcinovec section, according to a report in Pravda. Both projects are bypasses of Cadca, near the border with Poland and the Czech Republic, and Presov in eastern Slovakia. The newly appointed transport minister, Arpad Ersek, review the tenders, the Pravda report said. The Slovak Insti
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Slovakia: Strazov-Brodno D3 route around Zilnia to get EU funds
    May 10, 2016
    The European Union is providing nearly €202 million to finish the section of the D3 motorway between Strazov and Brodno around the city of Zilina in Slovakia. Zilnia is in north-west of Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. It is the fourth largest city of Slovakia with a population of around 85,000. The D3, formerly D18, is sometimes called the Kysuce Motorway. It was originally to be only a two-lane motorway in the Čadca - Slovak/Polish border