Skip to main content

Slovakia highway section open to drivers

An important highway section in Slovakia is now open to drivers
By MJ Woof February 15, 2021 Read time: 1 min
A stretch of Slovakia’s D1 route is now open – image courtesy of © Sjankauskas, Dreamstime.com

A new 11km section of the D1 highway in Slovakia is now open to drivers. The stretch bypasses Zilina and connects Hricovske Podhradie with Lietavska Lucka. This section of the D1 includes the Zilina tunnel and the 2.5km Ovciarsko tunnel. The work cost €445.17 million and construction was carried out by a contracting consortium comprising Doprastav Metrostav, Strabag and Vahostav.

Construction of the tunnel sections posed challenges for the builders. 

The D1 forms part of the trans-European Network (TEN) and is Corridor 5, connecting Ukraine with the Venice, on the Mediterranean. The Slovakian section of the route connects Ukraine with Vienna and runs through Bratislava.

Related Content

  • Consortium of Metrostav to build R2 Mytna stretch in Slovakia
    July 4, 2019
    Slovakia’s motorway company NDS has selected a consortium led by Metrostav of the Czech Republic to build a 13.5km stretch of the R3 The cost of the R3 carriageway between Mytna and Tomasovce in the region of Lucenec will be just under €128 million. Other members of the consortium include Prague-based Hochtief CZ and Bratislava-based Hochtief SK and work should start this summer for completion in two years. NDS reported that it had received six bids for the project which went to tender in February 201
  • Florida turnpike contract for Lane
    July 29, 2022
    Lane Construction has been awarded a Florida turnpike contract.
  • Support for underground tunneling work
    May 11, 2015
    The Brenner Base Tunnel is a key transport link and the use of the latest technology for support works has been played an important role. Work on the tubes of the Brenner Base Tunnel, one of the largest underground infrastructure projects underway at present, is seeing the use of sophisticated equipment. Excavation of the new Tulfes-Pfons section commenced in the third quarter of 2014 and the route will form part of the TEN Axis connection between Helsinki to Valletta. The new section, worth around €
  • New Colombian highways being built
    April 26, 2021
    New Colombian highways are being built at present.