Skip to main content

Slovakia continues to ponder an 8km Little Carpathian road tunnel

Controversy continues to swirl around Bratislava’s proposed D4 motorway bypass and what tunnel options under the Little Carpathian Mountains is the best value.
February 12, 2015 Read time: 2 mins

Controversy continues to swirl around Bratislava’s proposed D4 motorway bypass and what tunnel options under the Little Carpathian Mountains is the best value.

Only 3km of the 33km D4 in southwestern Slovakia have been built, a short stretch from the Austrian border at Jarovce to the junction with the D2 motorway. It opened in 1998. Since then the government has been studying the best routes to extend the D4 to the D1 motorway between Bratislava and Senec in order to create a southern bypass of Bratislava.

Some experts think that it will be enough simply to link up the existing D1 motorway, which heads out of the capital in a northeast direction towards Trnava, with the D2 motorway heading south into Hungary.

Others want to see the D4 motorway continue under the hills north of Bratislava to join the D2 motorway north of the city, in the direction of the Czech Republic.

Slovakia’s Transport, Construction and Regional Development Ministry is leaning towards the shorter option that likely would exclude tunnels and cost around reach €1.3 billion. This option would be made up of sections of the proposed D4 and another major route, the R7.

Martin Bakos, managing director of Amberg Engineering’s Slovakian office, said he is firmly on the side of completing an 8km tunnel.

Amberg completed a study in 2008 that investigated several options for crossing the Little Carpathians that, apart from a single 8km tunnel, looked at twin unidirectional tunnels and several shorter tunnels connected by open cuts in the rock. However, the study concluded a single long tunnel was likely the best option, to be completed using a tunnel boring machine.

Slovakia’s D2 motorway has the Sitina Tunnel, on the Lamačská cesta - Staré grunty section, that goes under the forested Little Carpathians. The 1.4km Sitina, which opened in 2007, is the first two-tube tunnel in Slovakia. On its official opening day, the ceremony included a drive through the tunnel by a Formula One car driven by David Coulthard.

The Little Carpathians – highest point around 770m -- are a protected environment area stretching around 100km westward from the end of the higher Carpathian Mountains. Infrastructure projects in the area are a delicate issue because of the area’s natural beauty and tourism offering, as well its wine-making industry.

Related Content

  • Slovakia’s transport infrastructure budget on track
    February 26, 2019
    Slovakia is on track with its transport infrastructure development programme, following a substantial budget set during 2018. Contracts worth a total of €1.5 billion were drawn up in 2018 for an array of transport projects. These include building new highway sections and upgrading existing sections of road or new bridges, as well as developing the country’s rail network. However, some of the funding available remains unspent. EU subsidies had been set to help pay for Slovakia’s transport improvements but b
  • New Zealand highway proposed
    June 15, 2021
    A potentially controversial tolled highway project has been proposed for New Zealand's South Island.
  • Agua Negra tunnel between Chile and Argentina
    May 15, 2014
    The current Paso de Agua Negra is the highest border crossing between Chile and Argentina. On the Argentine side, the Agua Negra Pass is located at 4,765m above sea level and 260km from the city of San Juan in the province of San Juan in the north-west of the country. On the Chilean side, the pass lies 229km from the city of La Serena in the Coquimbo region. The pass can be accessed from the Argentine side via National Highway No 150 from the province of La Rioja, which runs for a total of 390km. From the C
  • New Slovakia-Hungary bridge crossing
    June 7, 2019
    A new bridge connecting Slovakia with Hungary is under construction at present. Costing €117 million, the bridge spans the River Danube connecting Komarno in Slovakia with Komarom in Hungary. The project has been delayed but the bridge should be ready for traffic in 2020. Funding for the project is being provided by the EU and is being directed through the Slovakian Government and the Hungarian Government.