Skip to main content

Skanska wins UK road widening deal

Skanska has been awarded a major UK road widening deal.
By MJ Woof March 25, 2021 Read time: 2 mins
Skanska and Mott Macdonald will carry out a key dual carriageway project in the UK
 
Contractor Skanska will handle a road widening project worth £507 million in the UK in partnership with Mott Macdonald. The project is for the upgrading of a stretch of the A428 to dual carriageway status and the work includes improving a number of junctions along the route. Highways England is the client for the project and awarded the construction contract to Skanska, while Mott Macdonald will carry out the design portion. Skanska says that it won the work through the Highways England Regional Delivery Partnership (RDP) framework, for which it is a Delivery Integration Partner for the East of England and Midlands regions.

The work will see the road being widened along a 16km stretch between Black Cat and Caxton Gibbet, helping improve journeys between Cambridge and Milton Keynes and reducing journey times for drivers. Part of the A428 has already being widened to dual carriageway status and this will extend the upgrade, providing an improved connection to the important A1 route. The work is due for completion by 2026.
 
Lee Galloway, Highways England A428 Black Cat to Caxton Gibbet Improvements Interim Project Director, said: “The A428 Black Cat to Caxton Gibbet improvements scheme will transform one of the busiest road links in the East of England, helping to save drivers who live, work and travel in and around Bedfordshire and Cambridge an hour-and-a-half on their journeys every week. We’re extremely excited to be working alongside Skanska as we move through the design stages of this project and onto starting main construction.”
 
A number of junction improvements will also be made, including a new three-tier junction at Black Cat roundabout allowing free flowing traffic onto the A1 and the new dual carriageway.

Around 25,000 vehicles travel on the A428 between Cambridge Road and Caxton Gibbet every day. With considerable local housing and job growth expected, this number is likely to increase to around 33,000 vehicles by 2040.

For more information on companies in this article

Related Content

  • Mott MacDonald Sweco JV to design part of A96 dualling, Scotland
    June 16, 2016
    A Mott MacDonald and Sweco joint venture has been appointed by Transport Scotland to carry out route option assessment and detailed design work for dualling of the A96 highway between Hardmuir and Fochabers. The nearly 47km stretch of the road will provide users with improved journey times between two of Scotland’s economic hubs, the cities of Inverness and Aberdeen. In 2011, the Scottish Government published its Infrastructure Investment Plan which set out the Government’s plans for infrastructure i
  • UK average speed camera installation proving successful
    January 27, 2015
    Data from the A9 route in Scotland shows that the installation of average speed camera technology is helping cut crashes. This is Europe’s longest single enforcement scheme, with the technology having been installed along a 220km stretch of the A9 in Scotland. Figures from the route show that the average speed enforcement scheme, which uses SPECS technology supplied by Vysionics, is helping cut casualties while improving journey reliability and driver behaviour.
  • Mott MacDonald’s motorway to motorway metering
    December 20, 2017
    Mott MacDonald has developed a Motorway to Motorway (M2M) metering pilot scheme. This has been developed for Highways England and is being trialled between junction 21A of the M6 and junction 10 of the M62. The project is intended to smooth traffic flows and reduce the number of queues that occur because of congestion.
  • North East UK’s A19 /A1058 Coast Road triple-deck junction opens
    April 5, 2019
    More than 80,000 drivers a day are now using the recently opened and - first ever - North Tyneside triple-deck highway junction in the northeast. England’s A19 /A1058 Coast Road junction improvement scheme, being done for the client Highways England, was opened on time. However, there will be some overnight closures in the next several weeks to complete the landscaping, traffic light and footpath work. A time capsule has been buried on site and is due to be opened in 2118. Work started in June 2016 on