Skip to main content

The Sir Ambrose Shea lift bridge wins key award

The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction. Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry.
April 25, 2017 Read time: 2 mins
The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by 3220 Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction.


Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry. The bridge is raised approximately 2,400 times/year and is one of the few vertical lift bridges in Canada.

Parsons’ design and detailing of the bridge provided for construction of the substructure, approach spans, and lift-span towers without encroaching on the navigation channel. Disruption of boat navigation through the narrow waterway connecting the Atlantic Ocean to the inner harbour was limited to a few days during construction of the lift span and commissioning of the new bridge.

The link was opened to traffic on September 23rd, 2016 and features two vehicle lanes on each side, as well as pedestrian sidewalks. In addition it carries power and communication utilities. The Sir Ambrose Shea Lift Bridge also received a 2016 Design Award of Excellence from the Quebec Region of the Canadian Institute of Steel Construction.

For more information on companies in this article

Related Content

  • Quebec to build new Mercier Bridge for Montreal city
    May 12, 2017
    The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal. Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019. Construction of the new Champlain B
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • Sennebogen’s Algiers bridge
    January 21, 2013
    The Algerian SAPTA construction company, who specialise in road and traffic infrastructure construction, is using a Sennebogen 2200 crawler crane to assist with their commission to build a bridge in Algiers. Sennebogen service and sales partner EURL SM Maintenance delivered the 2200 crawler crane to SAPTA in July this year. It has since been set to work lifting, piece by piece, the steel support for the 600m long Algiers-based bridge. The crane will also be used for a range of other lifting tasks required a