Skip to main content

The Sir Ambrose Shea lift bridge wins key award

The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction. Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry.
April 25, 2017 Read time: 2 mins
The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by 3220 Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction.


Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry. The bridge is raised approximately 2,400 times/year and is one of the few vertical lift bridges in Canada.

Parsons’ design and detailing of the bridge provided for construction of the substructure, approach spans, and lift-span towers without encroaching on the navigation channel. Disruption of boat navigation through the narrow waterway connecting the Atlantic Ocean to the inner harbour was limited to a few days during construction of the lift span and commissioning of the new bridge.

The link was opened to traffic on September 23rd, 2016 and features two vehicle lanes on each side, as well as pedestrian sidewalks. In addition it carries power and communication utilities. The Sir Ambrose Shea Lift Bridge also received a 2016 Design Award of Excellence from the Quebec Region of the Canadian Institute of Steel Construction.

For more information on companies in this article

Related Content

  • Ho Chi Minh City pushes ahead with Thu Thiêm Bridge 4 project
    April 18, 2017
    Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project. The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review. In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investmen
  • India Bogibeel Bridge project
    December 14, 2016
    Construction work is underway on India’s Bogibeel Bridge, which will span the Brahmaputra River. When complete the bridge is expected to come with a price tag of US$746.8 million. The new bridge will provide both road and rail links over the Brahmaputra River and is expected to open to traffic in March 2018. The novel design features an upper deck with three traffic lanes for road vehicles as well as a lower deck carrying twin rail lines. Measuring 4.9km long, the bridge will be the longest in India carryin
  • Cebu-Cordova Link Expressway opens
    April 28, 2022
    The 8.5km expressway, in which Cowi was owners engineer for the client Metro Pacific Tollways, incorporates the longest and tallest bridge in the Philippines.
  • Messina Strait bridge study complete
    April 6, 2023
    The Messina Strait bridge study has been completed.