Skip to main content

The Sir Ambrose Shea lift bridge wins key award

The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction. Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry.
April 25, 2017 Read time: 2 mins
The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by 3220 Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction.


Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry. The bridge is raised approximately 2,400 times/year and is one of the few vertical lift bridges in Canada.

Parsons’ design and detailing of the bridge provided for construction of the substructure, approach spans, and lift-span towers without encroaching on the navigation channel. Disruption of boat navigation through the narrow waterway connecting the Atlantic Ocean to the inner harbour was limited to a few days during construction of the lift span and commissioning of the new bridge.

The link was opened to traffic on September 23rd, 2016 and features two vehicle lanes on each side, as well as pedestrian sidewalks. In addition it carries power and communication utilities. The Sir Ambrose Shea Lift Bridge also received a 2016 Design Award of Excellence from the Quebec Region of the Canadian Institute of Steel Construction.

For more information on companies in this article

Related Content

  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Montreal’s Champlain Bridge opens but late and over-budget
    June 27, 2019
    Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
  • Spencer Group cable access for Pattullo Bridge
    July 3, 2023
    Spencer is working on behalf of Fraser Crossing Constructors GP - a joint venture between Acciona and Aecon - on the suspension bridge near Vancouver, Canada.