Skip to main content

The Sir Ambrose Shea lift bridge wins key award

The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction. Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry.
April 25, 2017 Read time: 2 mins
The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by 3220 Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction.


Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry. The bridge is raised approximately 2,400 times/year and is one of the few vertical lift bridges in Canada.

Parsons’ design and detailing of the bridge provided for construction of the substructure, approach spans, and lift-span towers without encroaching on the navigation channel. Disruption of boat navigation through the narrow waterway connecting the Atlantic Ocean to the inner harbour was limited to a few days during construction of the lift span and commissioning of the new bridge.

The link was opened to traffic on September 23rd, 2016 and features two vehicle lanes on each side, as well as pedestrian sidewalks. In addition it carries power and communication utilities. The Sir Ambrose Shea Lift Bridge also received a 2016 Design Award of Excellence from the Quebec Region of the Canadian Institute of Steel Construction.

For more information on companies in this article

Related Content

  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Systra, Kiewit and Hatch to build third bridge in Kingston, Canada
    August 31, 2018
    Kingston, Canada, has selected Systra International Bridge Technologies, Peter Kiewit Sons and Hatch as the preferred consortium for the design and build Third Crossing project. Seven international teams answered the requests for proposals in February and 2018 with Systra, Kiewit and Hatch eventually chosen from a shortlist of three groups. The consortium will use an integrated project delivery model for the two-lane 1.2km bridge with a pedestrian and cycle path over the Cataraqui River will connect
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.