Skip to main content

The Sir Ambrose Shea lift bridge wins key award

The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction. Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry.
April 25, 2017 Read time: 2 mins
The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by 3220 Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction.


Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry. The bridge is raised approximately 2,400 times/year and is one of the few vertical lift bridges in Canada.

Parsons’ design and detailing of the bridge provided for construction of the substructure, approach spans, and lift-span towers without encroaching on the navigation channel. Disruption of boat navigation through the narrow waterway connecting the Atlantic Ocean to the inner harbour was limited to a few days during construction of the lift span and commissioning of the new bridge.

The link was opened to traffic on September 23rd, 2016 and features two vehicle lanes on each side, as well as pedestrian sidewalks. In addition it carries power and communication utilities. The Sir Ambrose Shea Lift Bridge also received a 2016 Design Award of Excellence from the Quebec Region of the Canadian Institute of Steel Construction.

For more information on companies in this article

Related Content

  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 22, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 21, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel t
  • India’s US$2.2 billion Mumbai Trans Harbour Link opens
    January 12, 2024
    India’s US$2.2 billion Mumbai Trans Harbour Link is being opened to traffic.
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the