Skip to main content

Singapore road tender opening

Singapore is opening the tender process for a major road project. The tender is for the construction and design of a section of the North South Corridor (Viaduct). This new link will connect Yishun Avenue 5 and SG Seletar. The tender process is being handled by Singapore’s Land Transport Authority. The closing date for the tender is 29th August, 2019. When fully complete in 2026, this highway will measure 21.5km in length.
June 10, 2019 Read time: 1 min

Singapore is opening the tender process for a major road project. The tender is for the construction and design of a section of the North South Corridor (Viaduct). This new link will connect Yishun Avenue 5 and SG Seletar. The tender process is being handled by Singapore’s Land Transport Authority. The closing date for the tender is 29th August, 2019. When fully complete in 2026, this highway will measure 21.5km in length.

Related Content

  • Louis Berger wins key India bridge deal
    January 10, 2018
    Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete. “We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish
  • £185 million deal for A9 in Scotland
    August 9, 2024
    A £185 million deal has been awarded for the A9 in Scotland.
  • Demolition of Seattle’s Alaskan Way Viaduct has started
    February 28, 2019
    Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel. According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this s
  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar