Skip to main content

Singapore road tender opening

Singapore is opening the tender process for a major road project. The tender is for the construction and design of a section of the North South Corridor (Viaduct). This new link will connect Yishun Avenue 5 and SG Seletar. The tender process is being handled by Singapore’s Land Transport Authority. The closing date for the tender is 29th August, 2019. When fully complete in 2026, this highway will measure 21.5km in length.
June 10, 2019 Read time: 1 min

Singapore is opening the tender process for a major road project. The tender is for the construction and design of a section of the North South Corridor (Viaduct). This new link will connect Yishun Avenue 5 and SG Seletar. The tender process is being handled by Singapore’s Land Transport Authority. The closing date for the tender is 29th August, 2019. When fully complete in 2026, this highway will measure 21.5km in length.

Related Content

  • ANTT handles Brazil highway tender
    April 8, 2014
    The tender process is underway in Brazil for the BR-153 Federal Highway, a project estimated to be worth US$1.89 billion. The BR-153 Belem Brasilia Highway route measures 625km long, connecting Anapolis, in Goias state, and Alianca do Tocantins, in Tocantins State. The tender is being handled by Brazil’s Land transport agency Agencia Nacional de Transportes Terrestres (ANTT) and the auction will take place on 23rd May 2014. The work involves widening the road within five years of the concession being grante
  • Indian road paving record set
    June 20, 2022
    A road paving record has been set in India.
  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km
  • Krasnodar central city connection
    November 2, 2018
    A new highway link is being planned for the Russian city of Krasnodar, which is expected to be ready for traffic in six years. The route will stretch 36km and connect the Kuban Stadium in the centre of the city with the M4 highway running around the outskirts. The project is expected to cost around US$340 million to construct. However, the route has still to be fully determined and the local authorities are opening tendering for the $1.42 million contract to handle the design and survey work. This new highw