Skip to main content

Singapore road corridor project due to commence

Construction work for Singapore’s North-South Corridor (NSC) project will commence in 2018. South Korean contractor Samsung C&T will carry out the first stage of work for the project in a deal worth just over US$601 million. The package of works was awarded to the firm by Singapore’s Land Transport Authority (LTA).
December 1, 2017 Read time: 1 min

Construction work for Singapore’s North-South Corridor (NSC) project will commence in 2018. South Korean contractor 1026 Samsung C&T will carry out the first stage of work for the project in a deal worth just over US$601 million. The package of works was awarded to the firm by Singapore’s 6101 Land Transport Authority (LTA). In addition to constructing road traffic lanes for vehicles, Samsung C&T’s contract includes building tunnels between Toa Payoh Rise and Novena Rise. In addition the firm will build cycling facilities, pedestrian bridges and bus stops. In all the NSC will be 21.5km long when it is completed.

For more information on companies in this article

Related Content

  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • €188.5 million Norwegian road contract
    June 27, 2024
    A new €188.5 million Norwegian road and tunnel contract has been awarded.
  • Partners win highway operation deal in New South Wales, Australia
    January 11, 2016
    Egis Projects and its partner Fulton Hogan Construction have won a major contract for the operation and maintenance of the WestConnex highway link in New South Wales Australia. The package was awarded by Sydney Motorway Corporation (SMC) to Fulton Hogan Egis O&M (FHEO&M). The partners hold equal 50% shares in the project. Egis has its share in the Australian project through its Australian subsidiary Egis Projects Asia Pacific.
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.