Skip to main content

Silvertown tunnel project awarded

A consortium made up of Cintra, Aberdeen Standard Investments and Macquarie Capital will build the new Silvertown Tunnel under the River Thames in the UK. The new tunnel is expected to cost £1 billion to construct. The tunnel will link the Greenwich Peninsula on the southern side of the Thames with Silvertown on the northern side. Construction of this new link will help reduce congestion on the existing Blackwall Tunnel, which is notorious for lengthy traffic delays at present. When the tunnel opens, it wil
May 31, 2019 Read time: 1 min

A consortium made up of 930 Cintra, Aberdeen Standard Investments and 2378 Macquarie Capital will build the new Silvertown Tunnel under the River Thames in the UK. The new tunnel is expected to cost £1 billion to construct. The tunnel will link the Greenwich Peninsula on the southern side of the Thames with Silvertown on the northern side. Construction of this new link will help reduce congestion on the existing Blackwall Tunnel, which is notorious for lengthy traffic delays at present. When the tunnel opens, it will lie within the new ultra-low emission zone (ULEZ) which is being expanded in 2021. The new tunnel was originally anticipated to be ready for use in 2023 but is now expected to open to traffic in early 2025.

For more information on companies in this article

Related Content

  • Cintra leads mega-toll project
    July 5, 2012
    A TEAM of private companies led by Spanish toll road operator Cintra has secured its financing for the Texas, USbased mega-toll project, the North Tarrant Express. The project The US$2 billion (€1.4 billion) project will rebuild existing lanes along Interstate 820 and portions of SH 183, and add new managed lanes as well, with construction expected to begin in late 2010.
  • Stonehenge Bypass Tunnel project facing judicial review
    February 19, 2021
    The UK’s Stonehenge Bypass Tunnel project is now facing a judicial review.
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th