Skip to main content

Serbia’s Zezelj bridge still to be repaired 15 years after NATO bombing

A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it.
May 2, 2014 Read time: 1 min
A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it. Dnevnik wrote that it is unclear when the bridge will be completed, mainly due to disputes between the main investor, the national railways company Zeleznice Srbije (ZS), and a company that has been awarded the rehabilitation project, the Spanish and Italian consortium of Azvi, Tadei, Horta and Koslada. Deadline for the completion of the bridge’s repairs ended last year.

Related Content

  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Gerald Desmond Bridge opening in California
    October 5, 2020
    The Gerald Desmond Bridge in California is opening for drivers.
  • Autostrade del Lazio awards Sacyr company SIS the Roma-Latina deal
    July 15, 2016
    SIS, a subsidiary of Spanish contractor Sacyr, has won a €2.8 billion contract to build and operate the 186km Roma-Latina motorway in Italy. Autostrade Del Lazio, a public company created to build and manage the motorway, awarded the public private partnership contract, officially called Corridoio intermodale Roma-Latina e collegamento Cisterna-Valmontone. The SIS Scpa consortium, which consists of Sacyr (49%) and Fininc di Torino (51%), will build-operate-maintain the highway over 50 years. Revenue i
  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion