Skip to main content

Serbia’s Zezelj bridge still to be repaired 15 years after NATO bombing

A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it.
May 2, 2014 Read time: 1 min
A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it. Dnevnik wrote that it is unclear when the bridge will be completed, mainly due to disputes between the main investor, the national railways company Zeleznice Srbije (ZS), and a company that has been awarded the rehabilitation project, the Spanish and Italian consortium of Azvi, Tadei, Horta and Koslada. Deadline for the completion of the bridge’s repairs ended last year.

Related Content

  • Cifa gets pumped over final work on Milan bypass
    May 14, 2015
    Truck-mounted concrete pumps from the manufacturer Cifa have been working around the clock at one of Italy’s most prestigious road infrastructure projects, the Milan Outer Bypass. The toll motorway project, known by the TEEM acronym from the Italian name Tangenziale Est Esterna di Milano, involves 32km of new carriageway consisting of three lanes in each direction in addition to an emergency lane. The route winds through agricultural land and connects the A4 highway (Milano-Venezia) in the north to the A
  • Consortium carrying out Colombian highway project
    July 25, 2014
    In Colombia a consortium will carry out the Perimetral Oriental road contract. The US$463.4 million contract is for a 153km section of road connecting Cundinamarca and Meta, which when complete will cut journey times by two hours compared with the current route. The consortium comprises Israeli company Shikun & Binui and local firm Grodco and Colombiana Inversiones en Infraestructura, which is owned by Spanish company Fomento de Construcciones y Contratas (FCC). The work will take four years to carry out an
  • KIT to study bridge vibration data
    July 7, 2025
    In Germany, the Karlsruhe Institute of Technology, KIT, will use acceleration sensors to gather vibration data from bridges to pinpoint structural degradation.
  • Pearl Harbor Memorial Bridge, an extradosed design, opens in Connecticut
    September 30, 2015
    The first extradosed designed bridge in the United States, the Pearl Harbor Memorial Bridge in New Haven, Connecticut, was opened to traffic on September 28.